My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000 AGN MAR 21 I27
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2000
>
2000 March 21 Agenda Packet
>
2000 AGN MAR 21 I27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:43:54 AM
Creation date
2/20/2014 2:09:06 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daryl Parrish <br />Page 2 <br />March 6, 2000 <br />We are respectfully requesting an additional $ 92,710.00 to complete the project. See attached <br />Storm Drain 3-5 Contract Extension Summary of Fees. The additional fees outlined herein will <br />include the remaining overall Project Management, Design completion of the Storm Drain <br />Geotechnical Engineering and the task related to the Environmental Assessment Study. <br />Our scope of services will, of course, continue to include our efforts to acquire 100% federal <br />funding for the project. We have enclosed a letter from USFWS which outlines the action plan <br />going forward. <br />Please let me know if you need additional information. We look forward to continuing our <br />excellent relationship with the City of Colton and the County of San Bernardino and assisting <br />both with the completion of this project. <br />Sincerely, <br />AjRROWUF TVAGEMENT GROUP <br />Glen R. Sams <br />Executive Vice President <br />GRS:sh <br />cc: Vana Olson, San Bernardino County Flood Control Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.