Laserfiche WebLink
DATE: JULY -8-2002 <br />FROM: AMER JAKHER, P.E., CITY ENGINEER <br />CITY OF COLTON <br />650 N. LA CADENA DRIVE <br />COLTON, CA 92324 <br />TO: TERRA -CAL CONSTRUCTION, INC. <br />14530 JOANBRIDGE STREET <br />BALDWIN PARK, CA 91706 <br />ENGINEERING DEPARTMENT <br />CHANGE ORDER #1 <br />MOUNT VERNON AVENUE <br />STREET IMPROVEMENTS & LANDSCAPED MEDIANS PROJECT <br />CHANGE ORDER # 1: INSTRUCTIONS TO THE CONTRACTOR AT THE REQUEST OF THE CITY <br />ENGINEER <br />UNIT <br />OTY COST <br />5,545 X $ 0.30 $ 1,663.50 <br />26 x $ 175.00 $ 4,550.00 <br />11,925 x <br />$ <br />UNR <br />$ <br />8,943.75 <br />MEAS <br />INCREASE QUANTITY: <br />1.50 <br />ITEM NO. 07 <br />REMOVE AND DISPOCE OF A.C. SIDEWALK <br />SF <br />$ <br />ITEM NO. 08 <br />REMOVE AND DISPOSE OF CONCRETE DRIVEWAY <br />EA <br />5 x <br />APPROACH <br />615.00 <br />ITEM NO. 10 <br />REMOVE AND DISPOSE OF CONCRETE SIDEWALK <br />SF <br />ITEM NO. 11 <br />SAWCUT AND REMOVE CONCRETE CURB <br />LF <br />ITEM NO, 15 <br />CONSTRUCT 4" THICK CONCRETE SIDEWALK PER <br />SF <br />CITY STANDARD DRAWING NC.109 <br />ITEM NO. 16 <br />CONSTRUCT RESIDENTIAL DRIVEWAY PER CITY <br />EA <br />STANDARD DRAWING 100•A <br />ITEM NO. 17 <br />CONSTRUCT COMMERCIAL DRIVEWAY PER CITY <br />EA <br />STANDARD DRAWING 111 <br />ITEM NO, 18 <br />CONSTRUCT 8" CONCRETE CURB PER CITY <br />LF <br />STANDARD DRAWING 106. <br />UNIT <br />OTY COST <br />5,545 X $ 0.30 $ 1,663.50 <br />26 x $ 175.00 $ 4,550.00 <br />11,925 x <br />$ <br />0.75 <br />$ <br />8,943.75 <br />60 x <br />$ <br />1.50 <br />$ <br />90.00 <br />31,730 x <br />$ <br />3.00 <br />$ <br />95,190.00 <br />5 x <br />$ <br />615.00 <br />$ <br />3,075.00 <br />18 x $ 2,000.00 S 36,000.00 <br />60 x $ 10.40 $ 624.00 <br />