Laserfiche WebLink
EXHIBIT "C" <br />JOHN EGAN AND ASSOCIATES, INC. <br />CONSULTING ENGINEERS <br />25814 Business Center Dr., Suite A <br />Redlands, 88 82374 —� <br />Phone: (909)9) 889-0-0 876 - Fax: (909) 798.7731 <br />r <br />December 11, 2001 <br />Lorraine June <<. <br />ti� 1 <br />Water and Wastewater CIP Coordinator <br />City of Colton Water and Wastewater Division <br />160 S. 10`h Street <br />Colton, CA 92324 <br />Subject: Additional Services Proposal <br />File: 118-022.00 <br />Dear Lorraine: <br />In conjunction with our current contract concerning design of Montecito Reservoir No. 2 and <br />related Reche Canyon transmission pipeline, you have requested that we submit a proposal <br />concerning additional services. Services, in general, will consist of design for additional <br />pipelines in the City's Reche Canyon transmission pipeline system. The project description, <br />proposed scope of services, and proposed fee are contained with this letter. <br />PROJECT DESCRIPTION <br />As design has proceeded concerning Montecito Reservoir and the Reche Canyon pipeline, it has <br />been observed that there is a need to complete construction for two gaps in the City's existing 16 - <br />inch transmission pipeline. These gaps in construction occur on Cooley Drive and Washington <br />Drive, and both involve crossings of the existing Reche Canyon Drainage Channel and adjacent <br />extensions and connections. <br />At Cooley Drive, required construction is approximately 140 feet of 16 -inch pipeline. At <br />Washington Drive, there is required to construct approximately 250 feet of 16 -inch pipeline and, <br />additionally, approximately 70 feet of 12 -inch pipeline and a connection to an existing 12 -inch <br />pipeline. <br />The channel is a County Flood Control District facility and it is noted that brackets have been <br />installed at the bridge crossing at each location in preparation for the 16 -inch. <br />While the Cooley Drive site is relatively clear of obstructions, it is noted that the alignment for a <br />crossing at Washington Drive and extension has numerous features including pipelines owned by <br />the City of Colton as well as by the City of Riverside/Gage Canal Company, street <br />improvements, and traffic signal features. Plans for both sites has been previously completed by <br />hand. Though at the Cooley Drive crossing there appears to be little change, at Washington <br />Drive there has been a major signal construction since the design was completed. <br />