My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 AGN MAR 26 I09
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2002
>
2002 March 26 Agenda Packet
>
2002 AGN MAR 26 I09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 8:28:18 PM
Creation date
2/20/2014 1:21:35 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #9 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE ADJOURNED CITY COUNCIL MEETING OF MARCH 26, 2002 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, CITY ENGINEER' ,9J. <br />SUBJECT: RECOMMENDATION FOR AWARD OF CONTRACT FOR THE <br />SANTA ANA RIVER PROJECT AREA - WASHINGTON STREET <br />MEDIANS PROJECT TO THE LOWEST RESPONSIBLE BIDDER, <br />GMC ENGINEERING, INC. IN THE AMOUNT OF $722,862.21 <br />DATE: MARCH 11, 2002 <br />BACKGROUND: <br />The Santa Ana River Project Area - Washington Medians Project, funded by the sale of Santa <br />Ana River Bonds, was approved for Engineering, Bidding and Construction on March 20, 2001. <br />The project, engineered by the consulting firm of LD King, was forwarded to the City of Colton <br />Engineering Department for administration of the bidding process in mid January of 2002. <br />The project is located within the existing center medians along Washington Street, between Hunt's <br />Lane and Weir Road. Construction includes the installation of storm drains, catch basins, curb and <br />gutter, enhanced stamped concrete, landscaping, irrigation and lighting. An existing curb return on <br />Barton Road is also included in the Project. <br />ANALYSIS/DISCUSSION: <br />Bid Opening for the Santa Ana River Project Area - Washington Medians Project was held <br />March 4, 2002. Bids were received from Contractors all over the Southern California; the <br />following seven (7) Bid Amounts are listed in descending order: <br />GMC Engineering, Inc. <br />$ <br />657,076.25 <br />Matich Corporation <br />$ <br />715,517.00 <br />Belaire-West Landscape, Inc. <br />$ <br />727,518.04 <br />Terra -Cal Construction, Inc. <br />$ <br />749,900.00 <br />Laird Construction Co., Inc. <br />$ <br />757,577.00 <br />4 -Con Engineering, Inc. <br />$ <br />757,937.70 <br />Sean Malek Engineering & Construction <br />$1,064,120.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.