My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 AGN MAR 26 I09
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2002
>
2002 March 26 Agenda Packet
>
2002 AGN MAR 26 I09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 8:28:18 PM
Creation date
2/20/2014 1:21:35 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There were errors and/or problems with four out of seven (4 out of 7) of the Bidding Proposals. <br />While some of these errors do not mandate rejection under state law, some errors were cause for <br />rejection due to non-responsiness. The adjusted Bids are as follows: <br />GMC Engineering, Inc. <br />Matich Corporation <br />Belaire-West Landscape, Inc. <br />Terra -Cal Construction, Inc. <br />Laird Construction Co., Inc. <br />4 -Con Engineering, Inc. <br />Sean Malek Engineering & Construction <br />*Extension errors in "Extended Amount" <br />**Addition errors in "Total Amount Bid" <br />***Cross -Outs in body of "Bid Schedule" <br />$ 657,147.46 <br />$ 715,427.00 ** <br />$ 68,259,918.04 <br />$ 749,900.00 <br />$ 757,577.00 *** <br />$ 757,937.70 *** <br />$ 1,064,120.00 <br />Total Bid Amount adjusted, per pg. D-3 of the <br />Contract Documents & Specifications. <br />Total Bid Amount adjusted, per pg. D-3 of the <br />Contract Documents & Specifications. <br />Bid Proposal deemed non-compliant; rejected <br />for cause <br />All Bids were reviewed for content and compliance with the Contract Documents and <br />Specifications, and all were complete, with the required attachments included. Two Bids were <br />rejected as non-responsive (Laird Construction Co., Inc. and 4 -Con Engineering, Inc.) due to <br />cross -outs on the Bid Schedule. The accuracy of the Extended Total for each Bid Item, and the <br />Total Amount Bid, was verified for each of the Bids submitted. While the Bids of GMC <br />Engineering, Inc., Matich Corporation, and Belaire-West Landscape, Inc. contained minor <br />errors, those errors can be waived as minor irregularities. References, Bid Bonds and Sureties <br />were verified for all of the Bid Proposals. <br />Based upon the above -noted review, the Lowest Responsible Bidder is GMC Engineering, Inc., <br />with a Total Amount Bid of $657,147.46. <br />ENVIRONMENTAL IMPACT <br />The proposed public improvements are Exempt under Section 15301 (Existing Facilities) of the <br />California Environmental Quality Act (CEQA). <br />FINANCIAL/FISCAL IMPACT <br />Construction of the Santa Ana River Project Area - Washington Medians Project is funded by <br />the Redevelopment Agency, Account Number 457-9150-9155-3890. The Engineer's Estimate for <br />this project was $630,000.00. The lowest responsive Bid is $657,147.46. A ten -percent (10%) <br />contingency of $65,714.75 is recommended, with the authority given to the City Manager to <br />approve change orders as needed up to this amount. <br />
The URL can be used to link to this page
Your browser does not support the video tag.