My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 AGN MAY 07 I14
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2002
>
2002 May 07 Agenda Packet
>
2002 AGN MAY 07 I14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 3:29:10 PM
Creation date
2/20/2014 1:20:15 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Services in Phase II: <br />1. We clarified the number of staff meetings, presentations and the Committees, Commissions and <br />Council presentation requested by the City. <br />2. As requested, we identified the number ofineetings and deliverables at the end ofPhase II. Tlvs <br />item also generated a reduction in fees. <br />Services in P6ase III: <br />1. The design team included, as an option, architectural drawings for a Vinyl Pavilion Struchue at <br />the request of the City. This service is identified as an option for both Services and Fees. <br />2. As requested, we identified the number of ineetings and deliverables at the end of Phase III. <br />Services in P6ase IV: <br />1. All services noted in the Bid Administration Phase, with the exception of the design team's <br />participation in the Pre-Bid Conference, have been omitted as sepazate services. The remaining <br />services noted in the original Scope of Services will be included as part of the project with no <br />additional fees assigned to those particular services. This item generated a reduction in fees. <br />Services in Phase V: <br />At the request of the City, the design team omitted the construction Management Services from <br />this phase. This item generated a reduction in fees. <br />2. As requested, we identified the number of ineetings at the end of Phase V. <br />Services in Phase VI: <br />1. This Phase and fee schedule was omitted from the proposal. We have included the services within <br />Phase V with no additional fees noted. <br />The attached Cost Quotation Eachibit has been revised to reflect the modifications identified in the <br />Revised Scope of Services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.