Laserfiche WebLink
CONTRACT FOR DESIGN-BUILD <br />CITY OF COLTON RECLAMATION OF AQUIFER SUPPLY PROJECT <br />1. PARTIES AND DATE <br />APPROVED BY <br />CITY O NCIL <br />Date � �Q3 <br />Item # <br />This Contract for Design-Build ("Contract") is made and entered into this 12�` <br />day of �� , 2003 by and between the City of Colton, a municipal corporation <br />("Owner") and US Filter/Ionpure, Inc., a corporation duly authorized to conduct business in the <br />State of California. ("Contractor"). <br />2. RECITALS <br />2.1 Owner is a municipal corporation organized under the laws oF the State of <br />Califomia, with power to contract for services necessary to achieve its purpose. <br />2.2 Contractor is a professional contractor, experienced in providing services far the <br />design and construction of the City of Colton Reclamation of Aquifer Supply Project ("ProjecY') <br />which includes, without limitation, the design and installation of a Perchlorate Ion Exchange <br />System ("IES") for the treatment of the City of Colton Wells Nos. 15, 17 and 24, as further <br />provided in this Contract, and is familiar with the plans of the Owner. <br />2.3 Owner desires to engage Contractor to perform the Project as set forth herein. <br />2.4 Contractor obtains and delivers in accordance with this Agreemeent, the <br />Performance Bond, Payment Bond, insurance documents and the other applicable certifications <br />as required by this Contract. <br />3. TEanTs <br />3.1 Incorooration of Documents. This Contract includes and hereby incorporates in <br />full the following documents, including all exhibits, drawings, specifications and documents <br />therein, and schedules, attachments and addenda thereto: <br />Exhibit A, Plans and Specifications <br />Exhibit B, General Conditions <br />Exhibit C, Price Schedule and Responsibilities <br />Exhibit D, Certifications <br />Attachment 1, Certification Labor Code — Section 1861 <br />Attachment 2, Nondiscrimination Clause <br />Attachment 3, Drug-Free Workplace Certification <br />(e) Exhibit E, Performance Bond, Payment Bond, Notice to Proceed. <br />(� Exhibit F, Escrow Agreement which Contractor has elected not to utilize. <br />City of Colron/USFiI[er/lonpure Page 1 of 17 <br />Contract for Design-Build, Reclamation of Aquifer Supply Project Rev. 052903 Final <br />