My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN FEB 04 I01
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 February 04 Agenda Packet
>
2003 AGN FEB 04 I01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2014 11:49:21 AM
Creation date
2/20/2014 1:35:59 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT FOR DESIGN-BUILD <br />CITY OF COLTON RECLAMATION OF AQUIFER SUPPLY PROJECT <br />1. PARTIES AND DATE <br />APPROVED BY <br />CITY O NCIL <br />Date � �Q3 <br />Item # <br />This Contract for Design-Build ("Contract") is made and entered into this 12�` <br />day of �� , 2003 by and between the City of Colton, a municipal corporation <br />("Owner") and US Filter/Ionpure, Inc., a corporation duly authorized to conduct business in the <br />State of California. ("Contractor"). <br />2. RECITALS <br />2.1 Owner is a municipal corporation organized under the laws oF the State of <br />Califomia, with power to contract for services necessary to achieve its purpose. <br />2.2 Contractor is a professional contractor, experienced in providing services far the <br />design and construction of the City of Colton Reclamation of Aquifer Supply Project ("ProjecY') <br />which includes, without limitation, the design and installation of a Perchlorate Ion Exchange <br />System ("IES") for the treatment of the City of Colton Wells Nos. 15, 17 and 24, as further <br />provided in this Contract, and is familiar with the plans of the Owner. <br />2.3 Owner desires to engage Contractor to perform the Project as set forth herein. <br />2.4 Contractor obtains and delivers in accordance with this Agreemeent, the <br />Performance Bond, Payment Bond, insurance documents and the other applicable certifications <br />as required by this Contract. <br />3. TEanTs <br />3.1 Incorooration of Documents. This Contract includes and hereby incorporates in <br />full the following documents, including all exhibits, drawings, specifications and documents <br />therein, and schedules, attachments and addenda thereto: <br />Exhibit A, Plans and Specifications <br />Exhibit B, General Conditions <br />Exhibit C, Price Schedule and Responsibilities <br />Exhibit D, Certifications <br />Attachment 1, Certification Labor Code — Section 1861 <br />Attachment 2, Nondiscrimination Clause <br />Attachment 3, Drug-Free Workplace Certification <br />(e) Exhibit E, Performance Bond, Payment Bond, Notice to Proceed. <br />(� Exhibit F, Escrow Agreement which Contractor has elected not to utilize. <br />City of Colron/USFiI[er/lonpure Page 1 of 17 <br />Contract for Design-Build, Reclamation of Aquifer Supply Project Rev. 052903 Final <br />
The URL can be used to link to this page
Your browser does not support the video tag.