My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN FEB 18 I04
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 February 18 Agenda Packet
>
2003 AGN FEB 18 I04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 4:57:30 PM
Creation date
2/20/2014 1:36:44 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aM a <br />CITY OF • • <br />W <br />CONTRACT AGREEMENT No. CA -035120302 <br />FOR: <br />DAVIS PARK RESTROOM <br />& PARK IMPROVEMENTS <br />PROJECT <br />Construction of Handicap Accessible Public Restroom; Installation of Utility Laterals; <br />Miscellaneous Electrical Work; AC Removal; Site Preparation; Drainage Mitigation; <br />Various Concrete Construction; Construction of 2'High Retaining Wall <br />PARTIES AND DATE. <br />This Contract is made and entered into this 3 W day of M MJCG 4 , 2003, by and <br />between the City of Colton (hereinafter called the "CITY") and Terra -Cal Construction, Inc. <br />(hereinafter called the "Contractor"). <br />RECITALS. <br />2.1 The CITY is a public agency organized under the laws of the State of California, with <br />power to contract for services necessary to achieve its purpose; <br />2.2 Contractor, in response to a Notice Inviting Bids issued by CITY on DECEMBER 18, <br />2002, has submitted a Bid for construction the DAVIS PARK RESTROOM & PARK <br />IMPROVEMENTS PROJECT described in the Contract. <br />2.3 CITY has duly opened and considered the Contractor's Bid, and duly awarded the Bid to <br />Contractor in accordance with the Notice Inviting Bids and the other Bid Documents, and has given <br />written notice to Contractor on February 19, 2003. <br />2.4 Contractor has obtained, and delivers concurrently herewith, Performance and Payment <br />Bonds and evidences of insurance coverage as required by the Contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.