Laserfiche WebLink
Item #1 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF JUNE 3, 2003 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER e <br />SUBJECT: AUTHORIZATION REQUEST TO ENTER INTO A <br />REIMBURSEMENT AGREEMENT WITH CITY OF GRAND <br />TERRACE FOR STREET RESTORATION OF MT. VERNON <br />AVENUE FROM GRAND TERRACE ROAD, NORTHERLY TO <br />THE I-215 NORTH BOUND OFF -RAMP. CITY SHARE OF <br />CONSTRUCTION COST ESTIMATE TO BE $27,569.92 <br />DATE: MAY 27. 2003 <br />BACKGROUND: <br />The condition of the Mt. Vernon Avenue from Grand Terrace Road northerly to the I-215 North <br />Bound off -ramp is seriously deteriorating. The City of Grand Terrace has requested participation of <br />the City in assisting with the paving restoration of this section of roadway. <br />The City of Grand Terrace has held a public bid and awarded a contract to Roquent to perform <br />pavement restoration to selected streets within the City of Grand Terrace. <br />In the anticipation of possibly having joint support from City of Colton in the repair of Mt Vernon <br />Avenue, Roquent was asked to provide a cost estimate for both Grand Terrace and City of Colton <br />portion of work. See attachment "A" for cost breakdown. <br />City of Grand Terrace is requesting the City to enter into a reimbursement agreement in the amount <br />of $27,569.92. City of Grand Terrace would be the lead Agency for the project. They will front all <br />cost and at the completion of the project bill the City for their fair share of the cost. <br />ANALYSIS/DISCUSSION: <br />The project would consist of pavement grinding, a leveling course, and adding a 3" petromat <br />overlay to this section of roadway. This project will be performed in accordance to prevailing wage <br />requirements. <br />The City Attorney has prepared a reimbursement agreement for the road restoration between the <br />