My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004 AGN SEP 07 I13
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2004
>
2004 September 07 Agenda Packet
>
2004 AGN SEP 07 I13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 12:21:27 AM
Creation date
2/20/2014 2:35:14 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />RENGINEERING <br />ESOURCES <br />OF S09THE N CAUFORNIA, INC. <br />100.00/P <br />June 10, 2004 <br />Amer Jakher, P.E., City Engineer <br />City of Colton <br />655 North La Cadena <br />Colton, CA 92324 <br />SUBJECT: REVISED ENGINEERING SERVICES PROPOSAL FOR AGUA MANSA <br />ROAD <br />Dear Amer: <br />In response to your request, Engineering Resources of Southern California, Inc. (ERSC) <br />submits this revised proposal concerning design services for widening of Agua Mansa Road. <br />The referenced previous proposal was submitted by John Egan and Associates, Inc. which has <br />subsequently been acquired by ERSC. <br />Included in the original proposal were sections related to qualifications and references. As the <br />information of these sections remains the same, it has not been repeated in this revised proposal. <br />Contained in the proposal, however, is a description of the project and project team as now <br />revised, project approach, project schedule, and proposed fees. <br />It is worth noting, I believe, that the length of the project is significantly different than had been <br />indicated to us in the pre -proposal meeting for the original project submittal of June 2003. At <br />that time, it was indicated that the project length was approximately 3,500 feet. In review of <br />documents obtained for this submittal, we have determined that the project length is closer to <br />5,000 feet, which affects our effort. <br />PROJECT DESCRIPTION <br />Proposed project will entail design services for Agua Mansa street improvements from Riverside <br />Avenue easterly to the San Bernardino County Flood Control Rialto Channel, length of <br />approximately 5,000 feet with port' s.of the street in the City of Rialto. Project effort will <br />involve design for widening gener�lly utilizing the centerline alignment and profile shown on <br />1820 COMMERCENTER CIRCLE, SAN BERNARDINO, CALIFORNIA 92408-3430 <br />PHONE (909) 890-1255 - FAx (909) 890-0995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.