My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2005 AGN APR 05 I17
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2005
>
2005 April 05 Agenda Packet
>
2005 AGN APR 05 I17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 4:50:13 PM
Creation date
2/20/2014 1:59:17 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #17 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF APRIL 5, 2005 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER <br />SUBJECT: AUTHORIZATION REQUEST TO SOLICIT PUBLIC BIDS FOR <br />AGUA MANSA ROAD -MOUNT VERNON AVENUE STREET <br />REPAIR PROJECT <br />DATE: MARCH 28, 2005 <br />BACKGROUND: <br />The Agua Mansa Road Street Improvement Project is part of the CIP (Capital Improvement <br />Program) Projects scheduled for construction for FY 04-05. The scope of the project includes cold <br />mill existing and overlay 1-1/2" to 2" asphalt along Agua Mansa Road from the County Limits to <br />the Rialto Channel. <br />Another project scheduled for construction this fiscal year is CDBG Project No. 104-30205/2617 — <br />Pavement Rehabilitation by grinding and overlay of portions of Mt. Vernon Avenue from Valley <br />Boulevard to Fairway Drive. By using the remaining funds for the Mt. Vernon Avenue Street <br />Improvement Project, portions of Mt. Vernon Avenue from Fairway Drive to Colton Avenue will <br />also be a part of the project. This project is funded with RDA (Redevelopment Agency) funds. <br />Rehabilitation of portions of Mt. Vernon Avenue from Colton Avenue to La Cadena Drive will be <br />an Optional Bid Item and will be added to the project if there is savings on the Base Bid Item. <br />RDA Funds <br />In September 1999, the Colton Public Financing Authority (the "CPFA") issued $5.29 million in <br />Tax Allocation Bonds secured by tax increment revenues in the Mt. Vernon Corridor <br />Redevelopment Project Area. Approximately $2.0 million was used to refund existing debt from <br />outstanding 1996 Notes, $500,000 was set aside for reserves and to pay for the cost of issuance, and <br />the remaining $2.7 million was identified and reserved for various Redevelopment projects. <br />On January 18, 2000, the Redevelopment Agency Board approved a list of public improvement <br />projects which were recommended by the Mt. Vernon Citizens Advisory Committee (CAC). On <br />June 4, 2002, the Agency and the City entered into a Construction Management Agreement (CMA) <br />to construct the public improvements. <br />Pursuant to the CMA, the City is responsible for the management and supervision of all aspects of <br />the design and installation of these public improvements, including the securing of right- of -way <br />and easements to complete these projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.