My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2005 AGN MAR 15 I21
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2005
>
2005 March 15 Agenda Packet
>
2005 AGN MAR 15 I21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 4:49:13 PM
Creation date
2/20/2014 1:59:43 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase N Construction Costs: $4.838.955 <br />Phase IV includes the construction of a parallel 9 -foot by 8 -foot precast <br />reinforced concrete box between the parallel 108 -inch RCP under <br />Interstate 10 and the Union Pacific Railroad and existing 78 -inch RCP in <br />Rancho Avenue at Agua Mansa Road. <br />Phase V Construction Costs: $1.462.400 <br />Phase V includes the construction of the 120 -inch RCP parallel to the <br />existing 78 and 90 -inch storm drain pipe in Rancho Avenue south of Agua <br />Mansa Road. The facility terminates in an existing concrete line <br />trapezoidal channel running between Rancho Avenue and the Santa Ana <br />River. <br />The total project funding needed for the design of phases I, II and III as well as the <br />funding for the construction of phase I has been acquired. The City is currently in the <br />process of acquiring the funding for the construction of phase II, $3,924,175; the City has <br />an available 20% match. The total construction cost of the project, all five phases, is <br />$14,315,510. <br />
The URL can be used to link to this page
Your browser does not support the video tag.