My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2005 AGN MAY 03 I12
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2005
>
2005 May 03 Agenda Packet
>
2005 AGN MAY 03 I12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 3:48:39 PM
Creation date
2/20/2014 1:58:40 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #12 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF MAY 3, 2005 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER <br />SUBJECT: AUTHORIZATION REQUEST TO REJECT ALL BIDS FOR THE <br />CONSTRUCTION OF BIG LEAGUE DREAMS SPORT PARK <br />PROJECT <br />DATE: APRIL 25, 2005 <br />The Big League Dreams Sport Park Project is a three (3) replica baseball field construction project <br />on an approximate 11.3 acre lot in the Cooley Ranch Area (vacant lot across Ashley Furniture site). <br />It includes construction of site amenities such as a restaurant/concession, administration and <br />maintenance buildings, multi-purpose pavilion, tot -lot playground area, and batting cages. <br />On December 16, 2003, the City Council authorized the pre -qualification process for the <br />construction of this project. The intent of the pre -qualification process, which started on September <br />22, 2004 together with the bidding process, is to properly screen the contractors that will participate <br />in the bidding process. <br />On January 18, 2005, the City Council authorized the rejection of bids (received on December 22, <br />2004) for this project and authorized the re -bid for this project at the same meeting. Staff received <br />the formal bid proposals on March 2, 2005 from three (3) pre -qualified contractors with their <br />corresponding bid amounts as follows: <br />Company <br />1. Ecology Construction <br />2. Edge Development, Inc. <br />3. Dale Construction <br />ANALYSIS/DISCUSSION: <br />Base Bid <br />with Bid Alternate <br />$ 8,085,406 <br />$ 11,461,406 <br />$ 8,131,010 <br />$ 11,492,186 <br />$ 9,760,414 <br />$ 11,714,505 <br />The bid difference submitted by the apparent low bidder and the second low bidder is less than 1%. <br />The lowest bid of $11,461,406 (with bid alternate) is considerably higher than the Engineer's <br />estimate of $9.5 million. The discrepancy is due to continuous price increases of construction <br />materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.