My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2005 AGN NOV 01 I11
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2005
>
2005 November 01 Agenda Packet
>
2005 AGN NOV 01 I11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 12:17:13 AM
Creation date
2/20/2014 2:37:33 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p 5 <br />vIGANT <br />77, <br />The project team members assembled for this assignment have relevant expertise and <br />experience in electric utility operations, financial planning, system planning, power and <br />fuel requirements, forecasting, risk assessment, and security and vulnerability issues. <br />The members of the project team also have a strong history of working with municipal <br />clients, particularly in California, to provide exceptional consulting services. NCI's <br />history of working with this segment of the utility industry has given our project team a <br />clear understanding of the challenges, objectives, and needs of municipal utilities. <br />The names and qualifications of all professional personnel who will be assigned to this <br />project are outlined below <br />Ron Stassi, a registered professional engineer in California, will serve as Project <br />Manager for NCI, and therefore, as the primary point of contact with NCI's project team. <br />He lives and works with a one hour drive to Colton that permits him to provide a high <br />degree of responsiveness for both routine and time sensitive project issues. Mr. Stassi <br />has extensive experience in a wide range of power supply activities including <br />negotiation of power contracts, power supply planning, and load forecasting and <br />operational risks. Mr. Stassi has garnered many years' experience in California relating <br />to the safe maintenance, operation and construction of electric power systems. He also <br />brings a strong municipal utility management perspective to the project having had <br />management responsibility in the electric utilities of Glendale, Burbank and Pasadena. <br />Additionally, because he has extensive experience in dealing directly with utility <br />management, boards and city councils, and union representatives, he understands the <br />need to keep Colton informed and involved in the project. <br />Gordon Pickering has 23 years of marketing experience in the natural gas and power <br />industries in both the United States and Canada. As a energy marketing professional, <br />Mr. Pickering has developed an in depth understanding of the natural gas and power <br />exploration and production sectors as well as knowledge of the increasingly <br />interconnected North American natural gas pipeline and power transmission systems. <br />Through his years as part of energy trading and marketing operations in both industries, <br />he has developed an in depth understanding of the role that risk management, hedging <br />Colton Electric — Risk Assessment and Management Plan 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.