Plan Operator for OMI, saying the City currently contracts with. <br />OMI for the maintenance and operation of the dater Quality <br />Control Plant and that the City has en)oyed good rapport with the <br />contractor. <br />Mr. Jon Reynolds, Krieger and Stewart, Consulting Engineers for <br />the City, informed the Council they have been working on the <br />Gityfs treatment plant upgrade/expansion design, deficiencies <br />design and construction management, and in the capacity of <br />engineering technical support for industrial waste pretreatment <br />program and prepared the special report on revenue/sewer service <br />rate. Mr. Reynolds reviewed Figures, 4, 5, 6, & 7 of the Workshop <br />Report giving an overview of the projects, including the LEMN,A <br />proposal for secondary treatment, and addressed the costs <br />associated with each., saying the LEMNA Proposal is very land <br />intensevice and the cost would be $6,484,000 as compared to <br />$1,528,000 for convententional nitrogen removal facilities. Mr. <br />Reynolds supported going with a single construction pro3ect as <br />apposed to phasing the construction, saying it would be more <br />economical. <br />Reviewing the Tables of the Workshop Report, Mr. Steve Herrera., <br />Krieger and Stewart spoke on the required revenue required to <br />support the costs for ongoing operation and maintenance and the <br />new treatment facility construction. Mr. Herrera reviewed <br />various figure tables showing .Alternatives, Phases and. Costs to <br />Existing User and Future User, the existing shortfall in, the <br />Operation Fund and the Capital Improvement Fund Balance of $1.6 <br />million and the need to burrow money. Mr. Herrera said the State <br />Revolving Lean Program has an interest rate of 2 - 3.5% with. a 20 <br />year payback; however, funds are very limited. They plan to <br />actively pursue a loan through the State but it is not a sure <br />thing. The City must also consider a revenue band or Certificate <br />of Participation at about 7% interest with a 30 year payback. <br />Burrowed money would be paid back through sewer service charges <br />of existing users and capacity charges in new development. In <br />reviewing the proposed sewer rates, Mr. Herrera said the Senior <br />citizen rate had to be eliminated in accordance with State law. <br />The increases are proposed to be incremental commencing on April <br />11 1993 and completing in July 1, 1996. Phase II would require <br />an increase of $.70 more than Phase I. In response to inquiry <br />regarding Grand Terrace, Mr. :Herrera said Grand Terrace would pay <br />10% less than the overall and they will be paying through, <br />connection fees. <br />Mr. Bernie Kersey, General Manager from the City of San <br />Bernardino 'Water Department, spoke on ,San Bernardino's future <br />growth and on the increase of future sewer service rates going to <br />$28.00 per month this summer. <br />Mayor Gonzales said in essence the proposed increase will be <br />$4.50. Mr. Herrera responded yes, the current residential is <br />5 <br />