Laserfiche WebLink
MAXIMUM DEMAND: <br />3. The maximum demand in any months shall be the measured maximum kilowatt <br />input indicated or recorded by instruments to be supplied by the utility <br />during any fifteen minute metered interval in the month. When the demand <br />is intermittent or subject to violent fluctuations, a five-minute interval <br />may be used. <br />POWER FACTOR ADJUSTMENT: <br />4. The charges shall be increased bye .50 for each kvar of reactive demand <br />in excess of 0.6 times the kilowatt demand measured during the billing <br />period. The kilovars of reactive demand shall be calculated by multiply- <br />ing the kilowatts of measured maximum demand by the ratio of the kilovar- <br />hours to the kilowatt-hours. Demands in kilowatts and kilovars shall be <br />determined to the nearest unit. A ratchet device will be installed on the <br />kilovar-hour meter to prevent its reverse operation on leading power factors. <br />TEMPORARY DISCONTINUANCE OF SERVICE: <br />5. When the use of energy is seasonal or intermittent, no adjustments will be <br />made for a temporary discontinuance of service. Any customers, prior to <br />resuming service within 12 months after such service was discontinued, will <br />be required to pay all charges which would have been billed if service had <br />not been discontinued. <br />FUEL COST ADJUSTMENT: <br />6. The rates above are subject to adjustment as provided for in schedule F.C.A. <br />The applicable fuel cost adjustment billing factor set forth therein will <br />be applied to all kwhr billed under this schedule. <br />