My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1983 RES NO 4276
Colton
>
CITY CLERK
>
City Council Resolutions
>
1980-1990
>
1983
>
1983 RES NO 4276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 6:07:13 AM
Creation date
2/20/2014 1:34:59 PM
Metadata
Fields
Template:
General Documents
Created By
cityclerk
DocType
Ordinances
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE G-2 <br />LARGE GENERAL SERVICE <br />APPLICABILITY <br />Applicable to single and three-phase general service including power and <br />lighting, where demand is 200kw or over. <br />PER METER <br />MONTHLY RATE PER MONTH <br />Demand Charge: <br />First 200kw or less of billing demand $564.71 <br />Next 1800kw of billing demand, per kw 2.69 <br />Next 8,000kw of billing demand, per kw 2.47 <br />All excess kw of billing demand, per kw 2.34 <br />Energy Charge (to be added to demand charge): <br />First 150 kwhr per kw of billing demand <br />First 30,000 kwhr, per kwhr 9.338 <br />Balance of kwhr, per kwhr 8.649 <br />Next 150 kwhr per kw of billing demand, per kwhr 8.097 <br />All excess kwhr, per kwhr 7.684 <br />High Voltage Discount: 4% of total bill <br />Minimum Charge: <br />The monthly minimum charge shall be the monthly demand charge. Total charge <br />equals sum of demand charge and energy charge. <br />SPECIAL CONDITIONS <br />VOLTAGE: <br />�.. Service will be supplied at one standard voltage. Three-phase and single- <br />phase normally will be served through one meter installation. <br />BILLING DEMAND: <br />2. The billing demand shall be the kilowatts of maximum demand but not less <br />than 50% of the highest maximum demand established in the preceding 11 <br />months, however, in no case shall the billing demand be less than 200kw. <br />Billing demand shall be determined to the nearest kw. <br />
The URL can be used to link to this page
Your browser does not support the video tag.