Laserfiche WebLink
SCHEDULE G-2 <br />LARGE GENERAL SERVICE <br />APPLICABILITY <br />Applicable to single and three-phase general service including power and <br />lighting, where demand is 200kw or over. <br />PER METER <br />MONTHLY RATE PER MONTH <br />Demand Charge: <br />First 200kw or less of billing demand $564.71 <br />Next 1800kw of billing demand, per kw 2.69 <br />Next 8,000kw of billing demand, per kw 2.47 <br />All excess kw of billing demand, per kw 2.34 <br />Energy Charge (to be added to demand charge): <br />First 150 kwhr per kw of billing demand <br />First 30,000 kwhr, per kwhr 9.338 <br />Balance of kwhr, per kwhr 8.649 <br />Next 150 kwhr per kw of billing demand, per kwhr 8.097 <br />All excess kwhr, per kwhr 7.684 <br />High Voltage Discount: 4% of total bill <br />Minimum Charge: <br />The monthly minimum charge shall be the monthly demand charge. Total charge <br />equals sum of demand charge and energy charge. <br />SPECIAL CONDITIONS <br />VOLTAGE: <br />�.. Service will be supplied at one standard voltage. Three-phase and single- <br />phase normally will be served through one meter installation. <br />BILLING DEMAND: <br />2. The billing demand shall be the kilowatts of maximum demand but not less <br />than 50% of the highest maximum demand established in the preceding 11 <br />months, however, in no case shall the billing demand be less than 200kw. <br />Billing demand shall be determined to the nearest kw. <br />