Laserfiche WebLink
23. Force MaJeure. Neither party shall be liable to the other for any failure or <br />performance caused by fire, flood, storm, strike, acts of God, unavoidable casualty, gov( <br />order or state of war or any other similar cause beyond the control of such party. A <br />ECOGROUP, INC. <br />0 <br />Date: <br />Cathy Guttenstein-Benign <br />Vice President and General Manager <br />A <br />CITY OF COLTON <br />By: <br />Malik Fr a <br />City M ger <br />Date: Ze.;�4�1 <br />of <br />Confidential - EcoGroup, Inc. 6 1996. coc 10/09/96 <br />