My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1988 AGN SEP 06 AGN I06
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1983 - 1989
>
1988
>
1988 September 06 Agenda Packet
>
1988 AGN SEP 06 AGN I06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 8:07:30 AM
Creation date
2/20/2014 6:54:33 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LINEAL PARK - SOUTH LA CADENA DRIVE Revised August 23, 1988 <br />Mr. Jaime Agui ]era Page 4 <br />D. BID PROCESS AWARD CONTRACT: <br />We understand the City will disperse) the plans, request <br />and receive bids from the appropriate contractors. We <br />w l l assist the City in the _eval luation of the bids <br />received and contract award. <br />E. FIELD OBSERVATION: <br />We will make periodic field observa ion'visits'of the <br />project during each phase of construction. We will at- <br />tend regular meetings to review cons ruction progress <br />the City's role wi-11" be to provide the day to day inspec- <br />tion and organize the meetings. W will support the <br />City, advising and making recommendations. Generally, <br />I the following site visits have bee projected and are <br />recommended as follows: <br />RECOMMENDED VISITS <br />1. Preconstruction Job Meeting <br />2 Site Construction Layout <br />3; Irrigation - mainline and equipment <br />4. Irrigation - lateralline and installation procedures <br />5. Irrigation - final coverage test <br />6. Planting - fine grade, soil prep, approve plant spot- <br />ting <br />7. Planting - final review/begin e$tabli.shment main- <br />tenance <br />8. 30 days maintenance period <br />9. 60 days maintenance period <br />10. 90 days maintenance period <br />11. General Administrative Time <br />12. Review/approve and sign contracto requests for pay- <br />ment,.review/check shop drawings, and review change <br />orders as required <br />NOTE: The above field program was prepared with the un- <br />derstanding that the City will provide inspection for all <br />work. Our role will be one of support,making recommen- <br />dations as may. be necessary. <br />� r <br />II. FEES AND CHARGES <br />A. The design process as presented her in represents our <br />comprehensive approach in solving the total project <br />needs. The phases and process are general in nature and <br />can be refined in accordance with more specific City <br />requirements and more detailed information. <br />MOld City.. Hall •Third Floor <br />License #1512 <br />3612 Seventh Street Riverside, ersi <br />de, California. 92501 <br />7 <br />(14 ) 781-1930 <br />
The URL can be used to link to this page
Your browser does not support the video tag.