My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1988 AGN SEP 06 AGN I06
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1983 - 1989
>
1988
>
1988 September 06 Agenda Packet
>
1988 AGN SEP 06 AGN I06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 8:07:30 AM
Creation date
2/20/2014 6:54:33 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LINEAL PARK SOUTH LA 'CADENA DRIVE <br />Mr., Jaime Aguilera <br />I� <br />Revised August 23,-1988 <br />Page 3 <br />5. Opinion of Probable Constructi <br />prepare an opinion of probable <br />based on the final preliminary pi <br />tablish the project construction <br />{ <br />C. WORKING DRAWINGS <br />n Cost We will <br />construction cost <br />n to be used to es- <br />udget. <br />Upon City review/approval of the preliminary plan, we <br />will prepare the following working drawings in sufficient <br />detail to facilitate site con structio <br />1. Site Construction Plan and Details = The construction <br />plan will locate landscape site c'nstruction elements <br />p �. t s <br />with appropriate detail call -outs. The following <br />details will be provided as necessary: <br />a. Picnic table <br />b. Trash recepticle <br />c. Handicap parking sign <br />d. Drinking fountain <br />e. Wood rail fence section <br />2. Grading Plan - The grading plan will illustrate ex- <br />isting and proposed contours of the project site with <br />appropriate spot grade elevations. On site water <br />will be included. <br />3. Planting Plan and Details This plan will locate and <br />identify all items of plana material to be used and <br />all landscape earthwork to be done. <br />4. Irrigation Plan and Details - This plan will layout <br />ail piping,. valves, control equipment, sprinkler <br />heads and for irrigation of all of the planted areas. <br />5. Specifications - We will prepare specifications iden- <br />tifying types and quality of materials and methods to <br />be used in construction. We will provide technical <br />specifications as may be requir d. The City will <br />provide their standard boilerplatefor usewithinthe <br />specifications. <br />6. Opinion of Probable Construction Cost - An opinion of <br />probable construction cost will be -developed based on <br />the working drawings. The opinion of probable con- <br />struction cost will be used to establish the final <br />project construction cost. <br />MOld City Hall 0 Third Floor <br />3612 Seventh Street, Riverside, California 92501 <br />License #1512 <br />(714) 781.-1930 <br />
The URL can be used to link to this page
Your browser does not support the video tag.