Laserfiche WebLink
- �.. .lbw-,.m...�w.w..... <br />RTE CORP IRVINE CA PAG.E.05 <br />CITY OF COLTON ELECTRIC DEPARTMENT <br />SPECIFICATION'S FOR <br />SINGLE PHASE .AND THREE PHASE PADMOUNT.TRANSFORMERS <br />REQUIREMENTS: <br />(1) All transformers should meet the requirements of NEMA & ANSI <br />u <br />standards. <br />2) Each bidder shall furnish as part of his quotation, one not of out- <br />line dimension andname--plate drawings of the transformer. <br />(,3) Unless otherwise approved by the Department, the dimensions ns ns of the <br />padmounted transformers shall be within limits specified in the <br />attaches] sketch. <br />(4) Arrangement of bayonet fuse, drip shield, HV bushing wells, parking <br />stand, Lap changer -twitch, primary load break switch and low voltage <br />spade termination shrall be as shown on sketch. <br />(8) Transformers should have cabinet door opening. <br />{S) To prevent formation of crust, the underside of each transformer shall <br />be coated with, a suitable asphaltic material, coal tar epoxy or with <br />a paint system which has been approved by the Department. <br />(7) Certified test reportvalues for nes load losses and total losses at <br />rated KVA shall be submitted with the transformer at time of ship- <br />ping'. The certified test report shall be sent.to the attention of: <br />Frincipal Electrical Engineer <br />City of Colton Electric Department <br />660 North La Cadena Drive <br />Colton, CA 92324 <br />Telephone: (714) 370-6104 <br />181 Bidder has to submit with hin'bid the guaranteed average no load core <br />losses and guaranteed average load losses at rated output on each lot <br />of like transformers submitted on this proposal. <br />AWARD OF BID: <br />,:The following criteria will be evaluated by the Electric Department in <br />making a; determination of the successful bidder for the purpose of making <br />an award: <br />(1) The firm price quoted FOS, delivered to Electric Yard, plus sales tax. <br />t2)- The delivery time quoted to Electric Yard. <br />(3) When specified in the quotation request, the cost of bid guaranteed <br />average trallsformer Tosses wi,l.l be used in the evaluation <br />