Laserfiche WebLink
MAR 882 ' 89 16:06 RTE CORP IRVINE CA <br />PRGE . 06 <br />A <br />(a) Evaluatioj by the Department will be accomplished by comparing <br />totals of quoted firm price including safes tax, FOB our Electric <br />Yard, plus bidguaranteed average Loss cost. <br />{b) The formula$ for evaluated total transformer 008 will be as <br />follows, t <br />Evaluated Total Cost = firm pries <br />quoted FOB at the City Of Colton <br />Electric Yard including sales tax plus <br />u, <br />$ axanteed average'lass cost. <br />Where Guaranteed ,Average Loss Cost s <br />A x guaranteed average no load losses in <br />: <br />watts. <br />+ 8 x guaranteed average full load losses <br />inwatts. <br />Where A _ $2.40 per watt <br />B - X1,21 per watt <br />Final payment will be dete-rained andPaid -after <br />cert ' e test e1�ort. -� the re9e121 of the <br />In the event tfiat distribution transformers are supplied with average <br />losses greater than the values quoted on the bid for these transformers, a <br />penalty will be asseased against the transformer manufacturer for <br />additian.al cast for added lossea, and penalty will be calculated by this <br />formula: <br />Penalty = (A x excess no load losses + Ax excess load losses) <br />The penalty, if any, shall be withheld from the final paynnent. <br />No credit is given for having certified loases lose than average <br />guaranteed losses quoted in the bid. <br />Specification revised June 22, 1988 <br />