My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1989 AGN MAR 07 I11
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1983 - 1989
>
1989
>
1989 March 07 Agenda Packet
>
1989 AGN MAR 07 I11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 9:16:33 AM
Creation date
2/20/2014 7:56:42 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Serving the World S Te,eonone <br />Environmental Needs (818) 7959.4' <br />250 North Madison Avenin <br />PO Box 7009, Pasadena. <br />Cairiomra 91109 7009 <br />JNM James M Montgomery <br />C.)r `-,ulUng E ngmwo.rS Inc February 23, 1989 <br />City of Colton <br />650 North La Cadena Drive <br />Colton, California 92324 <br />Attention: Mr. Terry Lyons <br />Water Superintendent <br />Subject: Proposal to Furnish Engineering Services to Upgrade and Relocate <br />the Existing Telemetry System and to Design New Telemetry for <br />Domecq and Walnut Complexes <br />Gentlemen: <br />In response to your request, James M. Montgomery, Consulting Engineers, Inc. <br />(JMM) is pleased to submit this proposal to provide engineering services in <br />connection with the water system telemetry upgrade and relocation design <br />as discussed in our meeting of February 16, 1989. <br />Based on the City's new system requirements, this proposal covers the design <br />for relocation of the existing master data acquisition and control computer <br />system and the associated radio telemetry equipment, from City Hall to the <br />City Yard. In addition, this proposal includes the design for relocation of the <br />existing digital monitoring and control panel from the Rialto site to the City <br />Yard. This digital panel will be modified and used as a backup to the master <br />computer system. <br />Another part of this proposal is for finalizing the design of the telemetry of <br />the Domecq supply storage and pumping facilities and the Walnut Complex <br />and to incorporate them into the overall telemetry and automatic control system <br />design. <br />A. SCOPE OF WORK <br />The proposed engineering services include the following tasks: <br />1. Project mobilization and project team organization meeting to <br />familiarize JMM staff with the project. The JMM project team <br />will review and evaluate the existing system and investigate design <br />alternatives based on the City's directives. <br />2. Make an inspection visit to the new central site (City Yard) to assess <br />the condition at the site for accepting the relocated master system, <br />the radio equipment, and the digital monitoring and control panel <br />This visit will also include a visit to the Rialto site to inspect the <br />condition of the digital panel 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.