My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990 AGN AUG 21 I08
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1990
>
1990 August 21 Agenda Packet
>
1990 AGN AUG 21 I08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 10:27:01 AM
Creation date
2/20/2014 7:02:44 PM
Metadata
Fields
Template:
General Documents
Created By
sespinoza
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON cY 40%N <br />iaaz <br />INTEROFFICE MEMORANDUM <br />TO: JOHN C. HLTIZCN, DIRE)=R OF PUBLIC WORKS DATE: JU,y 5, 1990 <br />FILE NUMBER: <br />FROM: ROBERT A. LAVIN, CHIEF UTILITY OPERA70R 1 I w., -- <br />SUBJECT: WELL #22 <br />At your request I contacted JF Davidson consulting engineers to discuss alternatives <br />to Well #22's air problein. I met with John Seba on Tuesday, July 3 and with a repre- <br />sentative from San Luis Tank & Piping, Gary Corippo at Well #22. <br />We looked at the possibility of moving the East Colton Heights Water Reservoir, however, <br />Mr. Corippo did not feel the tank was structurally sound and the materials used to coat <br />the tank were no longer acceptable to EPA. We discussed the possibility of building <br />a 40,000 gallon holding tank which will cost from $50,000 to $70,000. This tank <br />will be placed partially in ground so it will not be visible to the surrounding homes. <br />The tank will allow Well #22 to pump directly into it allowing the air to escape and <br />then pump the water back into the system. Also, after the completion of the new <br />reservoir in Reche Canyon we can either sell back the tank to San Luis Tank or <br />keep it as an alternative water source. If we should decide to keep the tank, Well <br />#22 will be able to pump into the tank or new reservoir. <br />The above solution seems the most viable and will allow us to go to Council on July <br />17, 1990 and have the tank completed 3 weeks after that in time for the hot August <br />and September months. <br />Please let me know if you wish to present this to Council. <br />/lj <br />
The URL can be used to link to this page
Your browser does not support the video tag.