My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990 AGN DEC 18 I06
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1990
>
1990 December 18 Agenda Packet
>
1990 AGN DEC 18 I06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 12:28:14 AM
Creation date
2/20/2014 7:04:28 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />KRtEc� <br />_� <br />�TEWART INCORPORATED <br />John C. Hutton <br />December 7, 1990 <br />Page 2 <br />construct various portions of the work. Three of these subbidders <br />were listed in the certified data by error. <br />Although the combined construction and engineering costs exceed the <br />combined City budget for the projects, $435,000, the construction is <br />mandatory to accommodate increasing flows to the Wastewater Treatment <br />F�anr and prevent sewage overflows. The excess cost can be met by <br />transrerring bucigeted tunds from the Congress Avenue project which has a <br />lower priority and can be delayed. Therefore, we recommend that the City <br />proceed to award Schedule I to M. Grbavac Construction Co. and Schedule <br />II to Albert W. Davies, Inc. <br />If you have any questions, please call me or Steve Herrera. <br />PES/blt <br />29P3JCH1 <br />Enclosure: Bid Summary Sheet <br />Sincerely, <br />KRIEGER & STEWART <br />�• <br />Jon C. Reynold <br />
The URL can be used to link to this page
Your browser does not support the video tag.