My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990 AGN OCT 02 I09
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1990
>
1990 October 02 Agenda Packet
>
1990 AGN OCT 02 I09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 4:47:46 PM
Creation date
2/20/2014 7:03:16 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Helen Cortez <br />September 21, 1990 <br />Page 2 <br />Assuming that Mesquite Group is offered a contract, I desire to <br />work carefully with the City in several contract areas including <br />the budget. In their proposal, Mesquite Group included an <br />approximately $60,000 contingency amount. That contingency <br />should be included in the contract, but is not to be available to <br />the consultant without the expressed consent of the project <br />managers, for both the City of Colton and the Energy Commission. <br />My approval of contracts and subcontracts is necessary as noted <br />in the funding agreement between the City and the Commission. <br />Helen, again I want to say to you a very special "Thank you" for <br />all the arrangements made before and during the panel interviews. <br />Everything progressed like clockwork. Please advise me of the <br />City Council's decision. <br />Sincerely, <br />ROLE PEAKE <br />Geothermal Project Manager <br />RP:st <br />cc: John Hutton, Director of Public Works <br />Michael Smith, Geothermal Program Manager, Energy Commission <br />
The URL can be used to link to this page
Your browser does not support the video tag.