Laserfiche WebLink
Proposed Street Rehabilitation (Continued) <br />Page 2 <br />The second phase of the project will be the simple overlay work as.specified by <br />purchase order held with Matich Corporation. This will include cold planning along <br />gutters, street prep, tacking and a 2" overlay mat. The City can anticipate a 7 to <br />10 year service life from these streets with this rehabilitation. The proposed <br />streets are: <br />1. Long Beach Drive, Rancho West to new development. <br />2. Latham Street, Long Beach Drive South to Laurel. <br />3. Laurel Avenue, Rancho Avenue West to new development. <br />4. Grand Avenue, Citrus Street South to Stevenson. <br />5. Herberts Lane, Grand Avenue East to Rancho Avenue. <br />6. Alston Avenue, Herberts Lane West to Tejon Lane. <br />7. Tejon Lane, Laurel Avenue North to cul-de-sac. <br />Phase II, Overlay Rehabilitation, Estimated Costs <br />A. <br />A.C. Paving <br />3,200 <br />Tons <br />@ <br />$ 30.00*= <br />$ <br />96,000.00 <br />B. <br />Cold Planning <br />16,049 <br />L.F. <br />@ <br />$ 0.79 = <br />$ <br />12,679.00 <br />C. <br />Adjust S.M. <br />34 <br />M.H. <br />@ <br />$295.00 = <br />$ <br />10,030.00 <br />D. <br />Raise W.V. <br />45 <br />W.V. <br />@ <br />$ 27.00 = <br />$ <br />1,215.00 <br />119,924.00 <br />$4.28/Square <br />Yard <br />5% Contingency <br />5,997.00 <br />$125,921.00 <br />*(Based on an increase in oil costs due to Middle East Crisis.) <br />NOTE: Prior to this overlay work, the City Streets crews would need to router the <br />lateral and longitudinal cracking in the pavement, weed kill and then seal <br />the cracks with an asphaltic sealer. <br />The third and final phase of this fiscal year's projects are prospective projects <br />requiring additional street improvements prior to paving or slurry sealing for <br />preventative maintenance to increase their length of service life. (A) indicates <br />additional work required, and (B) indicates slurry seal. These proposed streets <br />are: <br />A-1. Stevens Street (Requires Concrete Ribbon Gutter) <br />B-1. Acacia Avenue (5,600 S.F.) <br />B-2. Aqua Caliente Lane (19,116 S.F.) <br />B-3. Alder Lane (10,920 S.F.) <br />B-4. Applewood Street (28,368 S.F.) <br />B-5. Ashtree Lane (24,720 S.F.) <br />B-6. Ashwood Lane (9,850 S.F.) <br />B-7. Aspen Lane (13,500 S.F.) <br />B-8. Atchison Street (51,840 S.F.) <br />B-9. Bautista Lane (27,828 S.F.) <br />810. Beech Lane (8,000 S.F.) <br />B11. Branch Drive (10,520 S.F.) <br />B12. Buttonwood Street (46,080 S.F.) <br />B13. Candleberry Road (14,760 S.F.) <br />