My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1991 AGN MAY 28 I05
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1991
>
1991 May 28 Adj Agenda Packet
>
1991 AGN MAY 28 I05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 9:20:37 PM
Creation date
2/20/2014 7:13:11 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY E0 "91 11:58 INSITUFORM SOUTHWEST <br />Mr. Bob Lavine <br />City of Colton <br />B-9104034 <br />May 20, 1991 <br />Page r 2 <br />Insiituforming approximately 470' of 9" pipe <br />with polyester resin in alley at 10th Street <br />between "F" & "G" Street at 50.00 per linear <br />foot. <br />Subtotal = $28,200.00 <br />Reconnect approximately 30 service laterals <br />with internal cutter at $350.00 each. <br />Subtotal - $10,500.00 <br />TOTAL = $98,195.00 <br />P.3 <br />The cost of the video inspection will include the <br />determination of the condition of the line and the pipe length. If <br />the client or ISW wants to end the contract after this activity, <br />then it only owes ISW for the video inspection. <br />The cost of the Insituform activity includes a pre and post <br />video of the line, traffic control, bypass of flow and all <br />materials and labor (except as rioted in the following special <br />provisions) for the Insituform installation. <br />The following are special provisions that apply to this <br />project and estimates <br />1. The city of Colton (City) shall perform, or arrange for, <br />all point repairs needed for the Insituform process. <br />2. ISW will be installing a structural pipe into the, 8" & <br />loll pipes which will handle all loads the existing pipe <br />is handling. <br />3. All Insituform work for the project will conform to the <br />attached specifications titled 116tal3dard specifications <br />for the Insituform process" dated 2--90. <br />4. Final inspection and approval will be accomplished by a <br />post video of the line provided by ISW. <br />
The URL can be used to link to this page
Your browser does not support the video tag.