My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1991 AGN OCT 22 I31
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1991
>
1991 October 22 Agenda Packet
>
1991 AGN OCT 22 I31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 10:21:33 AM
Creation date
2/20/2014 7:16:53 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For Council Meeting oQctober 22 ,1991 <br />TO: Honorable Mayor and City Council <br />FROM: Leslie Keane Stratton, City Manager <br />SUBJECT: <br />Date: 10/15/91 <br />Resolution Authorizing Reprogramming Of <br />Community Development Block Grant Contingency/ <br />Reserve Funds To Colton Museum Project <br />The Colton Museum building renovations are substantially complete after <br />seven years of combined efforts by many agencies, community groups and <br />the Museum Association. There remains some outstanding items of repair <br />or replacement related to code compliance and historical preservation in <br />order to complete the renovation work for the Certificate of Occupancy. <br />A copy of the list of remaining work items is attached. All funding <br />sources for this work have been exhausted and the remaining work is <br />estimated to cost a total of $20,000 in labor and materials. There is <br />currently approximately $58,000 in the Community Development Block Grant <br />("CDBG") contingency/reserve fund. <br />DISCUSSION: <br />All of the remaining work can be done with City forces, and materials can <br />be purchased through the City's Purchasing Agent. All of the remaining <br />work can and must be completed prior to December 1, 1991 to facilitate <br />the planned grand opening to the public on December 15, 1991. All of the <br />remaining work appears to be eligible for CDBG funding as it is either <br />code required, historical preservation, or community beneficial use. <br />City Maintenance and Electrical Departments have reviewed the work and <br />determined it to be within their abilities to provide the labor and <br />assist in the purchasing. <br />The terms of the lease between the City of Colton and the Museum <br />Association require and obligate the City to provide a building "fit for <br />occupancy", which means all code requirements have been met. <br />Reprogramming these funds will provide the means to complete this long <br />awaited project in a timely manner. <br />Attachments: <br />Page 1 of_ 2 — <br />Item No. <br />REO'D;` <br />
The URL can be used to link to this page
Your browser does not support the video tag.