My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1992 AGN OCT 20 I03
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1992
>
1992 October 20 Agenda Packet
>
1992 AGN OCT 20 I03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:23:41 AM
Creation date
2/20/2014 7:21:54 PM
Metadata
Fields
Template:
General Documents
Created By
jshook
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep ju 92 !4;61 No.015 P.u,) <br />U <br />KmEcEQ INCORPORATED - ENGINEERING OGNSULTANTS <br />WAPT SW2 unawiq Aw # RMakw. (A 22501 - 761 714 -ON -69M 6 Fox 7WM-5D26 <br />July 1% 1992 312-39.2 <br />FJ. Schroeder, InteTim Public Utilities Director <br />City of Colton <br />650 North La Cadena Drive <br />Colton, CA 92324 <br />Subject: Wasttwater Tmatmew Plant 1990-91 Re0acement Facilities <br />Recommendation of Acoepitance of Contract Work <br />Dear Mir. Schroeder: <br />Vido Samarzicti, Inc, his completed the Contract Work for subject project, and the adjusted <br />Contract amourit for same is w forth as follows: <br />chigilw Contract <br />S662,000.00 <br />Contract Cbenp Order No. 1 <br />0.00 <br />Czntract Change Order No. 2 <br />5,640.00 <br />Contract Chaup Order No. 3 <br />0.00 <br />Conuw Change Order No. 4 <br />0.00,Z <br />Contract Change Order No. 5 <br />617.07 <br />Contract Manp Order No. 6 <br />74.26 <br />Acbustad Conrad S6W31-33 <br />Contract Change OTder No. I is artnbutable to exiending Contract time due to delays encountered <br />while execurting the Contract. Czatract Change Order No. 2 is pm*wable to the repair of twelve <br />eidsting concrete corbels i=dc Digester No. 2 and revision of Chlorine Storage Ro= infrared <br />hWen ftm 4W volt to 240 volt. Coontract 0tange Order ND. 3 is awnbable to extension of time <br />due to indement weather. Contract Change Order No. 4 is aivibutable to adding a paitting-acd <br />ooadng subcontractor to the list of subcontractors for the Mject. Contiva Ch=gc Order No'. 5 is <br />ascribable to: (1) replacement of two existing bell vahvs at the Cblorine Contact Chamber, M <br />mouting electrical oonduit of the Plant Heodworks to aqvly power to t1he proposed mechanical <br />bar screen, and (3) emending Contiml time due to inclement weatha. Contract Cbange Order No. <br />6 is attribr�)e to realignment of the proposed 4* buded ftcster gas piping directly i4aceni to <br />existing Digerer No. 2 and a credit for coiro of inspection services provided outside the limits <br />Veciflod by ContracL <br />Except for minor repa4 *wk, Coatrwt Work for subjW pTo*t was complete on June 24, 1992. <br />TU adjusted Completion Schedule for subject project required that. the CmUW Work be <br />completed bY May 23, 1992. We find no jiggificatioc warranting an extension of time for <br />completion of Contract Work beyond the June 24,1992 date. We have reviewed out findings witb <br />Colton's legal oounciL CDntrml stipulates that liquidated damages of $500.00 per calendar day <br />may he assessed for each of Lbe 32 days the Contract Work remained incomplete. <br />09-30-1992 02:44PM P.03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.