My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN JUL 05 I03
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 July 05 Agenda Packet
>
1994 AGN JUL 05 I03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:20:17 AM
Creation date
2/20/2014 7:38:36 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT BY:RURCHASINQ ; 5-31-94 8:54 ; City of Coltonâ–ş 9-8803064;# 2 <br />ADDENDUM #2 <br />DEMOLITION SPECIFICATIONS <br />AND INSTRUCTIONS <br />The City of Colton is seeking bids for the demolition of the structure listed below. <br />Specifications follow the property description and must be followed by the successful bidder. <br />All contractors are required to provide proof of possession of a current California State <br />Contractor's License, Liability Insurance, and proof of Workers Compensation. <br />SUBJECT PROPERTY: 1469 Holly Ave . <br />PARCEL NUMBER: 164-011-19 <br />TYPE OF STRUCTURE: Single Family Dwelling and Garage <br />TYPES OF CONSTRUCTION: Wood Frame <br />SPECIFICATIONS <br />1. Contractor is responsible for notification and securing authorization as specified in <br />Rule 1403 by the South Coast Air Quality Management District prior to proceeding <br />with demolition and providing proof of said authorization to the City Community <br />Development Department prior to purchasing the required demolition permits. <br />2. The contractor is responsible for purchasing all required . permits and a City business <br />license prior to commencing with said demolition. <br />3. The contractor is further responsible for all inspections by a City of Colton Bu ding <br />Inspector and satisfactorily performing all work as directed by said inspector. <br />4. The contractor is responsible for the total demolition of the structure and concrete <br />slabs. <br />S. The contractor shall remove any and all debris, trash, and rubble from the demolition <br />site. <br />6. The contractor shall dispose of all materials removed from the site in accordance <br />with any and all applicable regulations as required by state and local <br />governments. <br />7. The contractor shall cap any and all sewer lines at or near the property line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.