Laserfiche WebLink
7 <br />PROPOSAL <br />BIDDING SCHEDULE <br />FOR THE CONSTRUCTION OF PUMPING FACILITIES FOR WELL NO. 24 <br />ITEM <br />TOTAL <br />NO. <br />WORK OR MATERIAL <br />QUANTITY <br />AMUNT <br />T� l" ,. { _ <br />J <br />1 <br />Mobilization to <br />City of Colton <br />For <br />the <br />lump <br />sum of <br />$ z qjv <br />2 <br />Furnish and install one deep <br />well turbine pump, 200 hp <br />electric motor and discharge <br />head <br />For <br />the <br />lump <br />sum of <br />$ 000 oU <br />It <br />3 <br />Construct concrete pump ped- <br />estal, building foundations <br />and concrete floors <br />For <br />the <br />lump <br />sum of <br />$ 160t'00 <br />4 <br />Construct masonry building <br />complete including walls, <br />roof, fan and appurtenances <br />For <br />the <br />lump <br />sum of <br />$ 3 <br />5 <br />Construct discharge piping <br />from pump to tie-in to exist- <br />ing pipe including air release <br />valve, pump control valve and <br />all appurtenances <br />For <br />the <br />lump <br />sum of <br />$ <br />6 <br />Construct catch basin and <br />connect to existing drain <br />For <br />the <br />lump <br />sum of <br />$ <br />7 <br />Furnish and install the <br />chlorine solution tank, pump, <br />piping and all appurtenances <br />For <br />the <br />lump <br />sum of <br />$ ��• Ow <br />I <br />8 <br />Grading and paving <br />For <br />the <br />lump <br />sum of <br />$� <br />9 <br />Electrical controls, conduit, <br />wiring and all appurtenances <br />For <br />the <br />lump <br />sum of <br />$fir o O <br />10 <br />Miscellaneous items not in- <br />cluded in Items 1 thru 9 <br />For <br />the <br />lump <br />sum of <br />$ f 000, o <br />11 <br />Demobilization and clean-up <br />For <br />the <br />lump <br />sum of <br />$ / O% <br />TOTAL <br />ITEMS <br />1 THRU 11 $ <br />cv , ,'j•% <br />(, <br />7 <br />