My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN OCT 18 I17
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 October 18 Agenda Packet
>
1994 AGN OCT 18 I17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:54:54 AM
Creation date
2/20/2014 7:37:00 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compensation) shall name the City of Colton and the Engineer as an additional named <br />insured. All coverage shall be subject to approval by the City for adequacy of <br />protection. <br />F. Surety Bonds - at the time of delivery of the executed contract, the Contractor shall <br />furnish the City with a satisfactory Labor and Material Bond in an amount equal to one <br />hundred percent (100%) of the contract price and a Faithful Performance Bond in an <br />amount equal to one hundred percent (100%) of the contract price, said bonds shall be <br />secured from a surety company or surety companies satisfactory to the City. These <br />bonds shall remain in full force and effect for a period of one (1) year following the <br />date of filing of the Notice of Completion. <br />G. Designation of Subcontractors - in compliance with the provision of Section 4100- <br />4108 of the Government Code of the State of California, and any amendment thereof, <br />each bidder shall set forth below the name and location of the mill, shop or office of <br />each subcontractor who will perform work or labor or render service to the contractor <br />in the amount in excess of one-half of one percent 0 /2 of 1 %) of the total bid, and the <br />portion of the work which will be done by each subcontractor. <br />If the contractor fails to specify a subcontractor for any portion of the work to be <br />performed under the contract, he will be deemed to have agreed to perform such <br />portion himself, and he shall not be permitted to subcontract that portion of the work <br />except under conditions hereinafter set forth. <br />Subletting or subcontracting any portion of the work as to which no subcontractor was designated in <br />the original bid, shall only be permitted in case of public emergency and then only after a finding <br />reduced to writing as a public record of the Colton City Council. <br />Regarding the substitution of subcontractor, where a hearing is held pursuant to the provision of <br />Chapter 2, Division 5, Title 1 of the Government code, (commencing with Section 4100) by the <br />awarding authority or a duly appointed hearing officer, the City Clerk of the City of Colton shall <br />prepare and certify a statement of all costs incurred by the City for investigation and conduction of <br />the hearing, including the costs of any hearing officer and shorthand reporter appointed. <br />9:l obs\934633.10\specs\con-does 12 9 34 63 3.1 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.