My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2007 RES R-159-07
Colton
>
CITY CLERK
>
City Council Resolutions
>
2001-2010
>
2007
>
2007 RES R-159-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 8:46:35 PM
Creation date
2/20/2014 6:25:48 PM
Metadata
Fields
Template:
General Documents
Created By
sespinoza
DocType
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. City of Colton Public Works Department: "South La Cadena Sidewalk <br />Improvement Project," — Census Tract 69, along South La Cadena Drive <br />between Fogg Street and the Santa Ana River Bridge, $25,000. The project <br />will install curb, gutter, sidewalk and handicap ramp improvements. These <br />improvements will increase pedestrian and motorist safety along S. La Cadena <br />Drive. The identified improvements will also eliminate blight by improving the <br />surface flow and water drainage system. <br />7. City of Colton Public Works Department: "Olive Place and Virginia Avenue <br />Sidewalk Improvement Project," — Census Tract 70, $25,000. The <br />improvements identified by this project will install curb, gutter, sidewalk and <br />handicap ramps. This project will increase vehicular safety, pedestrian safety, and <br />eliminate blight by improving the surface flow and water drainage system in the <br />project area. <br />8. City of Colton Public Works Department -. "2"d, E and F Street Sidewalk <br />Improvement Project," — Census Tract 66, $25,000. The improvements <br />identified by this project will install curb, gutter, sidewalk and handicap ramps. <br />This project will increase vehicular safety, pedestrian safety, and eliminate blight <br />by improving the surface flow and water drainage system in the project area. <br />9. City of Colton Public Works Department: "12th, `A,' Armory & Johnston <br />Sidewalk Improvement Project," — Census Tract 67, $25,000. The <br />improvements identified by this project will install curb, gutter, sidewalk and <br />handicap ramps. This project will increase vehicular safety, pedestrian safety, and <br />eliminate blight by improving the surface flow and water drainage system in the <br />project area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.