Laserfiche WebLink
Survey of Major Streets Projects <br />COLTON <br />($000s) <br />Project Information <br />Phase <br />Funding <br />PRIOR <br />FY 11/12 <br />FY 12/13 <br />FY 13/14 <br />FY 14/15 <br />FY 15/16 <br />Widen Fairway Dr from Sperry <br />PA&ED <br />Dr to City limits from 2 lanes to <br />Total Cost: <br />$220.00 <br />4 lanes including bridge over <br />DIF <br />$ 95.90 <br />Lytle Creek <br />Measure I <br />$ 124.10 <br />Other: <br />Other: <br />PSE <br />Comments: <br />Total Cost: <br />$259.00 <br />DIF <br />$ 112.90 <br />Measure I <br />$ 146.10 <br />Other: <br />Other: <br />ROW <br />Total Cost: <br />$0.00 <br />DIF <br />Measure I <br />Other: <br />Other: <br />CONST <br />Total Cost: <br />$0.00 <br />DIF <br />Measure I <br />Other: <br />Other: <br />Realign Reche Canyon Rd to <br />PA&ED <br />Hunts Ln from Washington St <br />Total Cost: <br />$746.00 <br />to City limit and Widen Reche <br />DIF <br />Canyon Rd from City limit to <br />Measure I <br />$ 195.00 <br />$ 226.00 <br />City/Riverside city limits from 2 <br />Other: Local M I <br />$ 150.00 <br />$ 175.00 <br />lanes to 4 lanes <br />Other: <br />Comments: <br />PSE <br />Total Cost: <br />$820.00 <br />DIF <br />Measure I <br />$ 462.50 <br />Other: Local M I <br />$ 357.50 <br />Other: <br />ROW <br />Total Cost: <br />$689.00 <br />DIF <br />$ 388.60 <br />Measure I <br />$ 300.40 <br />Other: <br />Other: <br />CONST <br />Total Cost: <br />$0.00 <br />DIF <br />Measure I <br />Other: <br />Other: <br />Exhibit A - Measure I - CPNA.xlsx - Major St FY 11 Page 1 <br />