Laserfiche WebLink
Widen La Cadena Dr from <br />PA&ED <br />Rancho Ave to Iowa split <br />Total Cost: <br />$506.00 <br />including bridge over Santa Ana <br />DIF <br />$ 220.60 <br />River from 4 to 6 lanes <br />Measure I <br />$ 285.40 <br />Other: <br />Other: <br />PSE <br />Comments: <br />Total Cost: <br />$597.00 <br />DIF <br />$ 260.30 <br />Measure I <br />$ 336.70 <br />Other: <br />Other: <br />ROW <br />Total Cost: <br />$1,489.00 <br />DIF <br />$ 649.20 <br />Measure I <br />$ 839.80 <br />Other: <br />Other: <br />CONST <br />Total Cost: <br />$27,535.00 <br />DIF <br />$ 4,130.00 <br />Measure I <br />Other: HBP <br />$23,405.00 <br />Other: <br />Widen East side of Riverside <br />PA&ED <br />Ave from Riverside County Line <br />Total Cost: <br />$125.00 <br />to Agua Mansa Rd including <br />DIF <br />$ 54.50 <br />bridge from 2 to 4 lanes <br />Measure 1 <br />$ 70.50 <br />Other: <br />Other: <br />PSE <br />Comments: <br />Total Cost: <br />$0.00 <br />DIF <br />Measure I <br />Other: <br />Other: <br />ROW <br />Total Cost: <br />$0.00 <br />DIF <br />Measure I <br />Other: <br />Other: <br />CONST <br />Total Cost: <br />$0.00 <br />DIF <br />Measure I <br />Other: <br />Other: <br />Exhibit A - Measure I - CPNA.xlsx - Major St FY 11 Page 2 <br />