My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
R-016-18 Adopting the Process for Issuing Commercial Marijuana Operator Permits
Colton
>
CITY CLERK
>
City Council Resolutions
>
2011-2019
>
2018
>
R-016-18 Adopting the Process for Issuing Commercial Marijuana Operator Permits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 2:03:21 PM
Creation date
5/7/2018 2:57:58 PM
Metadata
Fields
Template:
City Clerk
Agenda Type
City Council
CC - Doc Type
Resolution
Date
2/19/2018
Resolution No.
R-16-18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Qualifications of Principals (300 Points) <br />• Operating Plan (300 Points) <br />• Security Plan (300 Points) <br />• Fire Plan (200 Points) <br />• Employee Safety (200 Points) <br />• The top three (3) applications, if applicable, will be interviewed and <br />evaluated by the City Manager based on the criteria listed above. <br />• Prior to the scheduling of the interviews in Phase 3, the final three <br />(3) applicants will be required to have their proposed site inspected <br />by designated city staff to ascertain current conditions of the facility. <br />Phase 3: Public Meeting and City Council's Final Selection <br />• Phase 3 Steps to be followed: <br />1. Public Meeting of top two (2) applicants. <br />2. City Manager's final review, evaluation, and <br />recommendation. <br />3. City staff prepares and presents final report to City Council. <br />4. City Council makes final selection. <br />Staff is anticipating the following timeline for the review and selection of <br />the commercial marijuana cultivation applications: <br />Application Period <br />March 1, 2018 through April 30, 2018. <br />No applications will be accepted after April 30, 2018 - 5:00 p.m. (PST) <br />Evaluation Period <br />April 2018 through May 2018. <br />Selection Period <br />May 2018 through June 2018. <br />23152.6300A\30431031.2 <br />02-20-2018 Council Agenda 266 <br />
The URL can be used to link to this page
Your browser does not support the video tag.