My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(4)AR 110408 AGRMT City of Grand Terrace
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2008
>
11/04/2008 6:00 pm
>
CONSENT CALENDAR:
>
Agreement/Grand Terrace
>
(4)AR 110408 AGRMT City of Grand Terrace
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 5:07:20 PM
Creation date
2/20/2014 12:03:04 AM
Metadata
Fields
Template:
Agenda Item
Item Number
4
Subject (2)
- Approve Execution of an Amended Cooperative Funding Agreement for the Barton Road Bridge Replacement Project, between the City of Grand Terrace and City of Colton.
Submitted On
10/30/2008
Submitted By
Sabdi Espinoza
Item Title
AR 110408 AGRMT City of Grand Terrace
ATRequest
2504
Status (2)
2
Department
City Clerk
Meeting Date
11/4/2008
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.555 <br />AMENDED COOPERATIVE FUNDING AGREEMENT FOR CC, B <br />CITY <br />CO O L <br />IT`y� CIL <br />BARTON ROAD BRIDGE REPLACEMENT PROJECT Date <br />Item # <br />Parties and Date. <br />This Agreement is made and entered into this'#' day of NWt*,be-- , 2008, by <br />and between the City of Colton ("Colton") and the City of Grand Terrace ("Grand Terrace") <br />(collectively the "Parties"). <br />2. Recitals. <br />2.1 The Parties share a boundary that runs through the approximate center of the <br />West Barton Road overhead bridge OH (54C-0379). <br />2.2 Grand Terrace has secured $350,623.00 in seismic retrofit funding from the State <br />of California Department of Transportation ("Caltrans") for retrofit of the Bridge to prevent its <br />collapse during a significant seismic event ("Retrofit Project"). <br />2.3 The seismic retrofit design has been completed. <br />2.4 Because the bridge is located within the boundaries of both cities, it is necessary <br />for the Cities to cooperate in authorizing the bridge replacement project. <br />2.5 The parties have decided to cooperate in seeking federal bridge replacement <br />program ("HBRR") funds to replace the entire existing bridge structure (the "Project"), with each <br />party contributing half of the local match requirement. <br />2.6 Each party has placed the Project on its Measure I, Five Year Capital <br />Improvement Program and Twenty Year Transportation Plan to cover their respective shares of <br />the Project and design costs. <br />2.7 The Project will consist of: <br />a. Replacing the existing structure with a new bridge that would have two <br />12 -foot lanes, two 8 -foot shoulders, two 1.75 -foot -wide barriers and a 4 -foot walkway for a total <br />width of 47.5 feet. The total length of the bridge will be approximately 178 feet. <br />b. Entire transitional approaches including sidewalk (A.D.A.). <br />Right-of-way acquisition. <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.