My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1997 AGN APR 01 I27
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1997
>
1997 April 01 Agenda Packet
>
1997 AGN APR 01 I27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:46:44 PM
Creation date
2/20/2014 5:34:39 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF APRIL 1, 1997 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />APPROVAL: MALIK D. FREEMAN, CITY MANAGER/ <br />FROM: THOMAS K. CLARKE, UTILITY DIRECTOR--T'OO ' <br />SUBJECT: GENERAL WATER RATE INCREASE <br />DATE: MARCH 24, 1997 <br />BACKGROUND <br />For some time, the water utility has been operating on very close margins. Revenues and expenses <br />were closely monitored to assure that the enterprise continued to operate in the black. However, little <br />effort was put forth to prepare a comprehensive financial plan and establish the proper cash flows to <br />allow for needed system improvements and capital additions. These financial requirements for certain <br />components of the water system have now become unavoidable and need to be addressed. <br />DISCUSSION <br />On April 3, 1992, Ordinance 0-07-92 was placed in effect setting the water rates for FY91,-92, FY92-93, <br />and FY93-94. The last of these became effective on July 1, 1993, the last time the rates changed. In <br />the report supporting adoption of the ordinance were projections for rate adjustments for FY94-95 and <br />FY95-96. These were not ratified at that time due to concerns of the uncertainty of the projections and <br />therefore staff was instructed to submit specific rate requests as those dates drew nearer. No formal <br />requests were presented to Council during the past two fiscal periods even though system needs have <br />been identified. <br />From a simplified approach, the water utility has done quite well without any additional rate increases. <br />The revenues have equaled or exceeded the expenditures. Unfortunately, an active capital <br />improvement for system expansion, reliability, and renewal and replacement was absent. This created a <br />situation whereby major components of the water system became operationally constrained. Wells, <br />transmission, and storage, along with a coordinated main replacement program, were all put on hold due <br />to the lack of capital improvement funds. Many of these components had already been identified for <br />rehab or replacement in the 1991 Water Master Plan, will be further defined in the 1997 MasterPlan, and <br />also in a more recent system inspection by the California Department of Health Services. <br />ANALYSIS <br />Water utility personnel have identified approximately $10 million of capital improvements that require <br />immediate attention to reinforce and/or enhance the reliability and deliverability of water on the domestic <br />water system. Their analysis indicates that the funds could be expended over a three year period.' <br />These -projects include well additions and refurbishment, construction of transmission mains, new and <br />rehabbed storage facilities, and certain main replacements and upgrades. Much of the work would be <br />done under contract, but some would be completed by City personnel. <br />Page 1 of 3 <br />Item No. 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.