My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1997 AGN FEB 04 I21
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1997
>
1997 February 04 Agenda Packet
>
1997 AGN FEB 04 I21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:52:44 AM
Creation date
2/20/2014 2:13:32 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAM -30-9 7 THU 11:59 Ah1 +-a Ls. red I ands <br />'tic: <br />+QTS ASSO IA TES INC. <br />AIA NA GEMENT- ENGINEERING - ARCHITI CTURE - PI.,ANIVING <br />t885COUNTRYCLUS DRIVE, REDLANDS, CA 92373 (509) 7924M FAY {609) 792.3852 <br />3272 No. "E" STREET, SUTB A, SAN BERNARDINO, CA 92305 (909) 824.3199 FAX (909) 792.3852 <br />DATE: 01-30-97 _FILE: 860000rcn,doc <br />TO: Darvl Parrish. Assistant City Manager C, ty of Colton <br />FROM. Tim R Wilson P.E. A.I.A.. Colton City Engineer's Office _ <br />SUBJECT:_ _ Reche Canyon Road Improvements by the County. of San Bernar ino <br />The County of San Bernardino is preparing to install street paving and drainage <br />improvements to Reche Canyon Road from Banas Road Borth to the City of Colton City <br />limits near Placid Lane. Particular attention is given to Prado Line which is to receive a <br />left turn line, a signal and to the immediate south will be drainage piping. I spolce today <br />with the County of San Bernardino Project Development Design Division Chief , Tony <br />Gray who has informed me of the project progress and schedule as follows: <br />• Advertisement of the Project will be from February to March <br />• A Bid opening is proposed in Alarch <br />• The project is to begin constriction in late May of 1997. <br />• Duration of the project is approximately 3 nionths <br />The above schedule is contingent upon (lie City of Colton having completed the required <br />waterline modifications by late April, 1997 <br />Please 611 us if you have any questions. <br />CC: Fide <br />P.01 <br />Item No. 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.