My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 011706 Amendment to Contract/Fraco Inc.
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
01/17/2006 6:00 pm
>
CONSENT CALENDAR
>
Amendment to Contract/Fraco Inc. -
>
AR 011706 Amendment to Contract/Fraco Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 10:05:06 PM
Creation date
2/19/2014 9:34:49 PM
Metadata
Fields
Template:
Agenda Item
Item Number
16
Subject (2)
Approve Amendment to the Contract with Fraco Inc to Incorporate Work on Hunts Lane for the Washington and Reche Canyon Realignment Project, Increasing the Original Contract by $67,544.
Submitted On
1/12/2006
Submitted By
Sabdi Espinoza
Item Title
AR 011706 Amendment to Contract/Fraco Inc.
ATRequest
573
Status (2)
2
Department
City Clerk
Meeting Date
1/17/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF JANUARY 17, 2006 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER <br />SUBJECT: APPROVE ATTACHED AMENDMENT TO THE <br />PROFESSIONAL SERVICES AGREEMENT WITH FRACO <br />ENTERPRISES, INC. TO INCORPORATE DESIGN WORK ON <br />HUNTS LANE FOR THE WASHINGTON AND RECHE <br />CANYON REALIGNMENT PROJECT, INCREASING THE <br />ORIGINAL DESIGN AGREEMENT AMOUNT BY $67,544. <br />DATE: January 09, 2006 <br />BACKGROUND: <br />Reche Canyon and Hunts Lane connect to Washington Street at "T' intersections approximately <br />700 feet apart. Washington Street is an East/West, four -lane roadway with two lanes in each <br />direction. Both Reche Canyon and Hunts Lane are two lane roads connecting at Washington Street <br />at offset signalized intersections in a North/South direction. <br />Two components of improvements are proposed along Washington Street between Reche Canyon <br />and Hunts Lane. The first component is at the intersection between of Reche Canyon and <br />Washington Street. The improvement to this intersection will modify the existing intersection <br />geometry to create two northbound left turn lanes by converting the existing northbound shared <br />left/right lane to an exclusive northbound left turn lane, add a free northbound right turn lane from <br />Reche Canyon to Washington Street and an additional eastbound right turn lane from Washington <br />street to Reche Canyon, all within the existing right of way. Modification of the existing signal at <br />this intersection will also be needed. <br />The second component of the proposed improvement will add two additional east bound lanes <br />between Reche Canyon and Hunts Lane, and modify the eastbound left turn lane at Washington <br />Street and Hunts Lane with potential signal modification at this intersection. The City is in <br />negotiations with Montecito Cemetery to acquire necessary right-of-way that would allow the <br />realignment of Reche Canyon Road to align with Hunts Lane. <br />The proposed additional scope of work includes realigning approximately 1,200 feet of Reche <br />Canyon south of Washington Street while maintaining the old alignment, thus forming a Split Y on <br />the road. The proposed Reche Canyon alignment will intersect at Hunts Lane. This will necessitate <br />a traffic signal modification and new traffic signals to accommodate the new traffic movements at <br />that new intersection, as well as additional striping to accommodate the expected traffic movements <br />on the new and old alignments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.