My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993 AGN APR 20 I23_Water Rate Program
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1993
>
1993 April 20 Agenda Packet
>
1993 AGN APR 20 I23_Water Rate Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:22:55 AM
Creation date
2/20/2014 1:12:10 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />CITY OF COLTON <br />AGENDA REPORT <br />For Council Meeting of— 4— Jo- 10 <br />Honorable Mayor and City Council <br />FROM: Gary Z. I <br />SUBJECT: Wastowati <br />Required <br />BACKGROMM: <br />, Public Utilities Director <br />Rate Program and <br />Treatment Facilities <br />Date: March 10, 1993 <br />on February 9, 1993 a workshop was hold to brief the Council on the required wastewater <br />revenues and the treatment facilities for the City Of Colton- The required treatment <br />facilities included construction at the existing treatment plant and advanced tertiary <br />treatment facilities, known as RIX at a now location on Aqua Mansa Road. <br />These facilities are to bring the City of Colton into compliance with the present Cease and <br />Desist Order from the State Regional Water Quality Control Board. The City Of Colton and the <br />City of San Bernardino have been working together, with the assistance of the Santa An& <br />Watershed Project Authority (SAWPA), to acquire the necessary land to construct the required <br />tertiary treatment facilities. <br />VISCUSSIOK: <br />At the October 6, 1992 Council meeting, Council authorized staff to work with SAWPA <br />in accomplishing the preliminary design for the RIX facilities and necessary interceptor <br />pipelines. The preliminary design ham now been completed and the final design is ready to <br />proceed. Also, all preliminary investigations have been completed for the acquisition of the <br />required land. <br />In order to stay on sch*dulo for compliance with the Cease and Desist Order the land <br />acquisition needs to be concluded now and the final design accomplished by the summer of <br />1993. <br />In order for the City of Colton to continue <br />acquisition, as well as to obtain construction <br />sales, the wastewater rate schedule outlined in <br />Stewart needs to be adopted by Council. <br />to participate with the design and land <br />funding, from either State loans or bond <br />the February 9, 1993 report by Krieger and <br />Staf f is continuing to work on the most cost off active ways to keep construction costs an low <br />as possible. At this time, the recommended rate schedule got forth in the Krieger and <br />Stewart report (attached rate schedule* for ordinance exhibit) needs to be adopted to allow <br />the City of Colton to provide sewer services in compliance with State and Federal <br />requirements. <br />Attachments <br />Page 1 of 2 <br />Item No— '20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.