My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN DEC 06 I37
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 December 6 Agenda Packet
>
1994 AGN DEC 06 I37
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 10:35:36 PM
Creation date
2/20/2014 7:37:41 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For Council Meeting of <br />December 6, 1994 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: Randy Anstine, Director of Recreation & Human Services <br />SUBJECT: Consideration and Ratification of Award of Bid For <br />The Following Trades In The Construction of the Colton <br />Community Center: Structural Steel/Metal Decking; Rough <br />Framing; Roofing; Flooring; Wood Flooring; Miscellaneous <br />Steel; Cabinets; Drywall,Plaster,Framing; Painting/Wall <br />Covering, Paving, Flooring <br />DATE: November 22, 1994 <br />RECOAUWENDATION: <br />Based upon the analysis of the bids as accepted by the Project Contract Manager, City <br />staff and the Contract Manager recommend ratification of the bid awards for construction <br />trades, related to the Colton Community Center. Award recommendation is as follows: <br />Paving work to Universal Asphalt Co.; Structural Steel/Metal Decking work to Cowelco <br />$293,800; Miscellaneous Steel work to Columbia Steel Inc., $43,397; Rough Framing work <br />to C & H Construction $216,100; Cabinet work to Stollo Cabinets, Inc., $30,965; Roofing <br />work to Letner Roofing $56,555; Drywall, Plaster, Framing work to John Jory Corporation <br />$396,206; Flooring work to Flooring Concepts $21,779; Flooring work to Flooring Concepts; <br />Painting/Wall Covering work to Saunders & McMillian, Inc., $43,800; Wood Flooring work <br />to All Sport Flooring $61,201. <br />POSSIBLE COUNCIL ACTIONS: <br />1. Approve as recommended by staff; or, <br />2. Reject any or all bids; or, <br />3. Deny. <br />AUTHORITY: <br />The California Government Code and the City of Colton Municipal Code, address the <br />requirements and procedures for public works contracts and notice inviting bids. Every <br />project involving an expenditure of more than five thousand dollars for the construction or <br />improvement of public buildings, works, streets, drains, sewers, utilities, parks, and play <br />grounds shall be let by contract to the lowest responsible bidder, after notice by publication. <br />,d�„ �a, 3 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.