Laserfiche WebLink
Page No. 66 <br />f. Units covered by the CEC Air Conditioner Directory and not <br />listed in the latest edition of the CEC Air Conditioner <br />Directory will not qualify unless written information is <br />provided by the CEC that the unit has been State certified. <br />g. For units in excess of 65,000 btu's per hour capacity, and no <br />SEER rating is provided in the applicable ARI Directory, and <br />where only the condensing unit is replaced and the existing <br />evaporative coil remains in use, the minimum EER rating listed <br />in the ARI Directory for that unit will be used to determine <br />the rebate amount. <br />h. For both lighting and air-conditioning measures, where the <br />measures are required to meet minimum Title 24 energy <br />standards, rebates will only be provided to the extent that <br />the measures exceed minimum Title 24 energy standards. The <br />purpose of this policy is to not provide rebates for measures <br />which otherwise would be required to meet Title 24 energy <br />standards. The City of Colton retains the right to determine <br />to what extent energy measures are required to meet Title 24 <br />energy standards and to what extent proposed measures exceed <br />Title 24 energy requirements. The City of Colton also retains <br />the right to request documentation from the commercial customer <br />applicant on the extent to which proposed measures exceed <br />minimum Title 24 energy standards. <br />III. Program Procedures <br />A. In order to receive a rebate under this program, the applicant must <br />submit a fully completed application to the City of Colton Electric <br />Utility prior to the installation of measures. Upon receipt of a <br />fully completed application the City of Colton Electric Utility will <br />set aside all available funds which may be required to meet the <br />rebate amount requested. <br />B. Upon receipt of a completed application, a representative from the <br />City of Colton Electric Utility will conduct an on-site pre - <br />inspection to determine the existing air-conditioning and/or lighting <br />system. <br />C. Upon the completion of the pre -inspection, the City of Colton <br />Electric Utility will inform the commercial customer applicant of <br />the approval of the rebate application. <br />ISSUED BY <br />Gale A. Drews Effective by Resolution No. R-2-91 Dated 1/3/91 <br />Electric Utilities <br />Director <br />