Laserfiche WebLink
elevation for the new pressure zone. A 24 foot high reservoir on the existing reservoir site would <br />high <br />provide a water elevation of approximately 1,364 feet, resulting in approximate static1. <br />pressures between 70 psi and 115 psi for the new pressure zone. Alternative No. 4 is shown on <br />Figure 7. <br />The new pressure zone would require the construction of approximately 8,000 L.F. of 12" pipeline; <br />modifications to the Prado Booster Station to pump to the ne%v reservoir, construction of a new 1 <br />MG water storage reservoir, and construction of a new booster station to pump from the new <br />reservoir to the existing Wild Canvon Reservoir. The estimated capital cost for Alternative No. 4. <br />is $1,400,000, which includes construction, construction contingencies, and administrative, legal <br />and engineering fees. <br />III -5 <br />