My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998 AGN JAN 13 I28
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1998
>
1998 January 13 Agenda Packet
>
1998 AGN JAN 13 I28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:11:09 AM
Creation date
2/20/2014 2:13:50 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
elevation for the new pressure zone. A 24 foot high reservoir on the existing reservoir site would <br />high <br />provide a water elevation of approximately 1,364 feet, resulting in approximate static1. <br />pressures between 70 psi and 115 psi for the new pressure zone. Alternative No. 4 is shown on <br />Figure 7. <br />The new pressure zone would require the construction of approximately 8,000 L.F. of 12" pipeline; <br />modifications to the Prado Booster Station to pump to the ne%v reservoir, construction of a new 1 <br />MG water storage reservoir, and construction of a new booster station to pump from the new <br />reservoir to the existing Wild Canvon Reservoir. The estimated capital cost for Alternative No. 4. <br />is $1,400,000, which includes construction, construction contingencies, and administrative, legal <br />and engineering fees. <br />III -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.