My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN MAY 06 I25
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 May 06 Agenda Packet
>
2003 AGN MAY 06 I25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 8:27:04 PM
Creation date
2/20/2014 1:38:22 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
require rehabilitation specific to the level of deterioration when rehabilitation commences. No <br />improvements will commence until the Gose of escrow on each lot sold. Quotes were received from <br />Structural Consultants, Inc. in the amount of $1,256 per unit of construction, and Myers <br />Construction, Inc., in the amount of $1,510 per unit of construction. Myers Construction, Inc. agreed <br />to accept the amount of $1,258 per unit of construction. <br />Financial Impact <br />Funds will become available from sales proceeds for each lot sold. Sales proceeds are deposited <br />into Rancho Mediterrania Project Capital Improvement Area Account Number 855-9550-9551-3890; <br />from which account Agency Improvement costs are disbursed. <br />Environmental Impact <br />None. <br />Recommendation <br />To meet the contractual obligations for Garage Improvements on approximately 90 vacant lots to be <br />sold and 25 Agency owned lots converting to Owner Occupied lots, Staff recommends that the <br />Agency Board enter into a contract with Structural Consultants, Inc., for a period not to exceed one <br />year, on an as -needed basis and in the amount not to exceed $1,256 per unit of construction, <br />$115,000 in total; and Myers Construction, Inc., for a period not to exceed one year on an as - <br />needed basis and in an amount to exceed $1,256 per unit of construction, $115,000 in total for <br />Garage Improvements on sold lots at Rancho Mediterrania Manufactured Home Estates, 700 E. <br />Washington Street. Total of both contract not to exceed $230,000. <br />Attachments <br />Attachment A - Scope of Agency Garage Improvements <br />Report Prepared by: Judith Clarke <br />'Ta.I�ll'i/ <br />Finance Director: <br />Manager: 1J.:/SD`--- OTHER: <br />
The URL can be used to link to this page
Your browser does not support the video tag.