My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2005 AGN APR 19 I14
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2005
>
2005 April 19 Agenda Packet
>
2005 AGN APR 19 I14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 12:20:31 AM
Creation date
2/20/2014 1:58:50 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANALYSIS/DISCUSSION: <br />The City of Colton hired the design services of Minagar and Associates, Inc. to prepare the plans <br />and specifications for the traffic signal at Mt. Vernon Avenue and Colton Avenue intersection. The <br />plans and specifications have been completed and are ready for the construction process. <br />The proposed modification of existing traffic signals at this intersection is necessary to increase the <br />safety of Washington Alternative High School students, pedestrian and motorist. In addition this <br />modification will avoid damage to the signal pole by turning vehicles. <br />CONFLICT OF INTEREST: <br />Siena Pacific Electrical Company <br />President or equal: Barry Loop <br />ENVIRONMENTAL IMPACT: <br />The proposed public improvements are exempt under Section 15301 of the California <br />Environmental Quality Act (CEQA). <br />FINANCIAL/FISCAL IMPACT: <br />The Mt. Vernon Avenue and Colton Avenue Traffic Signal Modification Project needs to be <br />budgeted. The total anticipated construction costs for the project are $31,450, plus a ten percent <br />contingency, a total of $34,595 will be budgeted in account number 450-0542-6900-3890 from <br />unexpended traffic impact fees collected in fiscal year 2004/2005. <br />RECOMMENDATION: <br />Staff respectfully recommends that Council approve: <br />1) Award of construction contract for Signal Modification at Mt. Vernon Avenue and Colton <br />Avenue Project to Sierra Pacific Electrical Company, the only respondent to the request for <br />proposal (RFP), and <br />2) Resolution budgeting $34,595.00 from traffic impact fees. <br />Attachments: <br />Resolution <br />Report prepared by Aftab Hussain — Public Services/Engineering <br />TEAM ONLY <br />Attorney: <br />Finance Director: <br />City Manager: OTHER: <br />
The URL can be used to link to this page
Your browser does not support the video tag.