Laserfiche WebLink
SCHEDULE G-2 <br />LARGE GENERAL SERVICE <br />APPLICABILITY <br />Applicable to single and three-phase general service including <br />power and lighting, where demand is 200 kw or over. <br />PER METER <br />MONTHLY RATE PER <br />MONTH <br />Demand Charge: <br />First 200kw or less of billing demand - - - - - - $350.00 <br />Next 1800kw of` billing demand, per kw - - - - - - - - $ 1.60 <br />Next: 800kw of billing demand, per kw - - - - - $ 1.20 <br />A11 excess kw of billing demand, per kw - - - $ 1.05 <br />Energy Charge (to be added to demand charge): <br />First 150 kwhr per kw of billing demand <br />First 30,000 kwhr, per kwhr - - - - - - - 3.15 <br />Balance of kwhr, per kwhr - - - - - - - - - - - 2.63 <br />Next 150 kwhr per kw of billing demand, per kwhr - 2.40 <br />All excess kwhr, per kwhr - - - - - - - - - - - - - 2.304J <br />Minimum Charge; <br />The monthly minimum charge shall be the monthly demand charge. Total <br />charge equals sum of demand charge and energy charge. <br />SPECIAL CONDITIONS <br />Voltage: <br />1. Service will be supplied at one standard voltage. Three-phase <br />and single-phase normally will be served through one meter install- <br />ation. <br />BILLING DEMAND: <br />2. The billing demand shall be the kilowatts of maximum demand but <br />not less than 50a/ of the highest maximum demand established in the <br />