My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN DEC 06 I30
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 December 6 Agenda Packet
>
1994 AGN DEC 06 I30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 3:06:53 PM
Creation date
2/20/2014 7:37:32 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Contract: 1994-1. Overhead Line Construction <br />Name of bidder: D& B ELECTRIC, INC. <br />To: City of Colton <br />Electric Utility <br />650 North La Cadena Drive <br />Colton, California 92324 <br />Addenda received and considered in the submission of this proposal are <br />enclosed as follows: <br />ADDENDUM N0. 1- I�OVEMBER 3, 1994 <br />ADDENDUM N0. 2- NOVEMBER 9, 1994 <br />The undersigned bidder hereby proposes and agrees, if this proposal is <br />accepted by the Owner, to enter into Agreement in the form attached to perform <br />all work, which includes the assumption of aIl obligations, duties and <br />responsibilities necessary to the successful completion of the Contract and <br />the furnishing of all bonds, insurance, labor, equipment, materials, <br />compliance submittals, services, and supervision indicated or specified in the <br />contract documents to be performed or furnished by Contractor for the lvmp sum <br />firm price of TWO HUNDRED EIGHTY-ONE THOUSAND, FIVE HUNDRED NINETY-THREE <br />dollars $ 281,593.00 , The above lump sum firm price includes a cash <br />allowance of four percent which will be used to fund any additional work. <br />The price set forth above is subject to the following list which states any <br />and all variations from, and exceptions to the requirements of the contract <br />documents and that, otherwise, it is the intent of this Proposal that the work <br />will be performed in strict accordance with the contract documents. <br />(Attach additional pages as required.) <br />[COLTON 24183 OVERHEAD LINE CONSTRUCTION 72.0001] <br />[ 10/24j94 ] <br />P-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.