My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN DEC 06 I30
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 December 6 Agenda Packet
>
1994 AGN DEC 06 I30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 3:06:53 PM
Creation date
2/20/2014 7:37:32 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The portion of the contract price allocated for the following items are listed <br />below. <br />Item <br />Mobilization <br />Performance Bond <br />Payment Bond <br />Taxes <br />Insurance <br />Right-of-Way Clearing <br />Concrete Foundation Construction <br />Independent Testing Laboratory <br />Wood Pole Framing and 5etting <br />Steel Pole Erection and Framing <br />Conductor Stringing and Clipping-In <br />Grounding <br />Other ( Specify ) <br />Subtotal <br />Four Percent Cash Allowance <br />Lump Sum Firm Price <br />Allocated Price <br />$ 800.00 <br />$ 5,098.00 <br />$ .00 <br />$ .00 <br />$ 10,752.00 <br />$ 3,200.00 <br />$148,070.00 <br />$ 580.00 <br />$ 38,007.00 <br />$ 21,153.00 <br />$ 40,763.00 <br />$ 2,340.00 <br />$ .00 <br />$ <br />S <br />$270,763.00 <br />$ 10,830.00 <br />$281,593.00 <br />The undersigned proposes that he will perform the majority of the work at the <br />project site with his own forces and that specific portions of the work not <br />performed by the undersigned will be subcontracted by the following <br />subcontractors. <br />[COLTON 24183 OVERHEAD LINE CONSTRUCTION 72.0001J <br />[ 10/24/94 J <br />P-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.